BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated February 6, 2025

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information.

The Construction Management Professional for the Pump Station 1 Improvements and Modernization project will be responsible for providing Construction Management Resident Engineer (CMRE) services, Inspection services, and Owner-Advisor Services for the Design-Build contract for the Pump Station 1 (PS1) Improvements and Modernization project. This project includes the upgrade, rehabilitation and modernization of Pump Station 1 (PS1), one of the largest and most critical pump stations with the City of San Diego's (City) wastewater collection system. The scope of the PS1 project includes rehabilitation/replacement of all six (6) pumps and rotating assemblies; replacement of the existing motor starters and liquid rheostats with variable frequency drives (VFD), replacement of the motors to work with the associated VFDs, replacement of all suction pipes, replacement of the six (6) 48" suction gate valves, replacement of the six (6) 36" discharge gate valves, replacement of the existing 30" cone valve system, removal of the existing venturi flow meters and replacement with new modern flow meters on new discharge piping. In addition, the project includes the rehabilitation of wet wells #1 and #2, and full replacement of mechanical screens, pipe supports, and straps. Facility enhancements also include electrical and instrumentation upgrades, additional monitoring systems, replacements of facility piping and valving, safety enhancements, replacement of sluice gates and motors, concrete repairs, operational improvements, and other work within the pump station. PS1 shall remain operational during construction. The project will require one CMRE for a duration of approximately 620 construction working days plus 40 working days start-up and 80 working days for close-out. The project will require as-needed Inspection including but not limited to structural, concrete, mechanical, welding, electrical, coating, corrosion, and instrumentation and controls (I&C). Working hours will be during daytime, however some nighttime or weekend work may be required to avoid impacts to pump station operations and changes to the working hours could be required throughout the contract duration in order to meet specific project needs. The PS 1 Project is a Design-Build contract, with 958 workings days and a scheduled Notice to Proceed in December 2024, and will require Owner-Advisor services during the design and construction phase. Estimated Bid Value Range between $5 Million & $7 MIllion. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$7,000,000.00

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
43
Bidding Soon
1,385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

Project location map

Multiple Locations, San Diego, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.