BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2025 at 7:00 PM

Updated February 12, 2025

Demolition, site work, renovation and addition to a medical facility in San Diego, California. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the renovation of a medical facility; and for site work for a medical facility.

BID PACKAGE SCOPE OF WORK LICENSE TYPE ESTIMATED CONST. COST 2A: Site, Select Demolition & Earthwork C21 $197,565 2B: Deep Foundations C61 $204,440 2C: Concrete C8 $493,450 2D: Structural Steel & Misc. Metals C51 $726,291 2E:Roofing, Sheetmetal & Expansion Joints C39 $197,200 2F: Glazing C17 $247,310 Subcontractors will be required to be properly licensed by the California Contractors State License Board with the appropriate license for their specified scope of work. Layton Construction Company is the construction manager/contractor for this project and will oversee the subcontractor prequalification and selection process for the University of California. PROJECT DESCRIPTION: The Thornton MRI Expansion and Renovation project consists of an exterior addition of 3,400 SF and a renovation of 760 SF within the existing MRI suite. The Department of Health Care Access and Information (HCAI) formerly the Office of Statewide Health Planning and Development (OSHPD) is the state jurisdiction that will oversee the project. The timeline for the project includes approximately 10 months of design, 10 months of agency review for permit, and approximately 14 months of construction with an anticipated start of construction in January 2025. Phase 1 - This phase includes the MRI expansion which is an exterior single-story addition to the existing Thornton Pavilion that includes two new MRI suites, MRI equipment rooms, control room, inpatient holding, outpatient waiting room, patient toilet, and support spaces. It should be noted that the existing MRI suite will remain in operation during Phase 1 construction. Phase 2 - This phase includes the renovation of the existing MRI suite and includes the refurbishment of the existing control room, new staff toilet, and shared office space as well as modifications to the fire protection, plumbing, mechanical, and electrical systems to accommodate the proposed renovation. Anticipated Construction Duration - May 2025 to October 2026 You will receive an email confirmation once your completed Prequalification Questionnaire is received. If you do not receive a confirmation email within one (1) business day, please contact Kimberly Amaral (kamaral@laytonconstruction.com) to confirm receipt. All information requested in the Prequalification Questionnaire must be provided to be considered "responsive" to the requirements of the prequalification. The confidentiality of the information provided will be respected to the extent permitted by law. Every effort will be made to ensure that all subcontractors have equal access to contracts and other business opportunities with the University of California within the limits imposed by law or University policy. Each subcontractor may be required to show evidence of its equal employment opportunity policy. The successful subcontractor will be required to follow the nondiscrimination requirements set forth by the University and to pay prevailing wage at the location of the work. The University of California and Layton Construction Company are committed to promoting and increasing participation of small business enterprises (SBE), disabled veteran business enterprises (DVBE), disadvantaged business enterprises (DBE), and women-owned business enterprises (WBE) as it relates to the scope of work included within this bid package as subject to any and all applicable obligations under state and federal law as well as University policy. The scope of work in included within this advertisement is public work subject to section 1771 of the California Labor Code. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All subcontractors, regardless of tier, listed on a bid for, or engage in the performance of, any scope of work on the project, must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1.

Post-Bid

Medical

$1,966,256.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
108
Bidding Soon
1,313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

May 30, 2025

Project location map

Multiple Locations, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.