Published February 21, 2025 at 7:00 PM
Updated May 2, 2025
Site work and paving for a mixed-use development in Appleton, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Concrete Paving No bid shall be received unless accompanied by a bid bond (uploaded electronically during bid process) equal to five percent of the bid, payable to the City as a guarantee that if the bid is accepted, the bidder will execute and file the proper contract and bond within 10 days from the date the lowest responsible bidder's bid is accepted. If the bidder fails to file such contract and bond within the time set by the City, the bid bond shall be forfeited to the City as liquidated damages. PROJECT UNIT A-25 CONCRETE PAVING 5200 SY 8" Doweled Concrete Pavement 39,800 SY 7" Plain Concrete Pavement 5765 SY 12" Stone Base 3735 CY Excavation 42,150 SY Fine Grading 256,650 SF Concrete Sidewalk/Driveway 31,300 SY Terrace Restoration 170 LF 12"-60" Storm Sewer 36 EA Storm Inlets 2400 LF Pavement Marking. The City reserves the right to reject any and all bids or to accept any bid deemed for the best interests of the City and to waive any informalities in the bidding. Street From To 1. Perkins Street - From Prospect Ave to- RR Track NEW CONSTRUCTION Street From To 2. Cherryvale Avenue Gladiolus Pl Apple Creek Corridor 3. Golden Gate Drive Cherryvale Ave 200' e/o Cherryvale 4. Peregrine Boulevard Baldeagle Dr Apple Creek Rd 5. Baldeagle Court/Drive cds w/o Peregrine Blvd Osprey Dr 6. Osprey Drive Harrier Ct Baldeagle Dr 7. Harrier Court cul de sac Osprey Dr 8. Aquamarine Avenue French Rd Denali Tr 9. Denali Trail Rubyred Dr n/o Aquamarine Ave 10. Rubyred Drive French Rd Denali Tr 11. Providence Avenue bridge n/o Edgewood Dr Aquamarine Ave 12. Aquamarine Avenue Providence Ave Amethyst Dr UNIT A-25 CONCRETE PAVING 8" Doweled Concrete Pavement 7" Plain Concrete Pavement 12" Stone Base Excavation Fine Grading Concrete Sidewalk/Driveway Terrace Restoration 12"- 60" Storm Sewer Storm InletsPavement Marking The general sequence of construction for city streets shall be followed as described below. Specific construction sequence requirements for each street, as detailed later in these special provisions and on the plans, shall take precedence over the following general requirements. Reconstruction 1. City will establish baseline/reference line and provide the contractor with cut sheets. The contractor shall not commence with any work on the street until they have been provided the cut sheets. 2. Contractor shall remove existing pavement, existing sidewalk (where applicable), excavate to subgrade, place geogrid, and place crushed stone base. 3. City will provide line and grade stakes along both sides of the street for contractor to build proposed pavement/curb and gutter. It shall be the responsibility of the contractor to establish all other grades from these stakes. (i.e. centerline, intermediate grades) Once the contractor has completed the excavation and graveling work, the city survey crew shall have 48 hours to complete the staking for mainline pavement/curb and gutter and the development of the cut sheets. The contractor shall not begin the mainline setup work until the mainline cut sheets have been provided by the city's survey crew. 4. Contractor will construct proposed pavement. The contractor shall note that additional sidewalk may be marked for removal after the new curb and gutter has been installed due to grade issues with relation to the new pavement. 5. Contractor will construct proposed sidewalk. New Construction 1. The city will provide line and grade stakes along both sides of the street. The contractor shall not commence with any work until the City has provided cut sheets. It shall be the contractor's responsibility to establish all other grades from these stakes. 2. The contractor shall remove existing asphalt pavement and fine grade the existing stone base. Existing sidewalks shall not be disturbed at this time. 3. The contractor shall construct proposed pavement, one half at a time. 4. Once pavement has been constructed, the city will mark sidewalks for removal and replacement. 5. Contractor shall install new driveway aprons, new sidewalks, and remove and replace any existing sidewalks as marked in the field. The contractor should anticipate a starting date of April 28, 2025 - completion date of September 12, 2025
Award
Roads / Highways
$4,187,820.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2025
April 28, 2025
Multiple Locations, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Feb 03 2025
Appleton, WI
Bid Date: Feb 13 2025
Appleton, WI
Bid Date: Feb 03 2025
Appleton, WI
Bid Date: Feb 17 2025
Appleton, WI
Bid Date: Feb 13 2025
Appleton, WI
Bid Date: Feb 18 2025
Appleton, WI
Bid Date: Mar 04 2025
Appleton, WI
Bid Date: Oct 27 2020
Appleton, WI
Bid Date: Feb 04 2025
Appleton, WI
--
Appleton, WI
Bid Date: Jan 16 2025
Appleton, WI
Bid Date: Feb 03 2025
Appleton, WI
Bid Date: Feb 11 2025
Appleton, WI
--
Appleton, WI
Bid Date: Feb 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.