Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 25, 2025 at 8:00 PM
Updated April 26, 2025
Site work and new construction of a multi-residential development in Appleton, Wisconsin. Completed plans call for the construction of a 40-unit multi-residential development.
*Northcentral Construction Corporation was not awarded. Project Information Archive Apartments consists of a new ground up (40) unit apartment building with a Community Room, Non-Profit Offices, Mechanical/Storage Rooms, Parking Garage, and associated site work. Section 3 reporting along with Green Built Home selections are required and must be met. All subcontractors will need to adhere to these requirements. This project has WHEDA requirements and has a mandatory 15% participation. Tentative Start Date: April 1st, 2025. Building: 64,060 sqft 40-unit, four-story multifamily apartment building with a common amenity space. This project also consists of a separate business tenant. Type VA Construction with a cast-in-place concrete lower level, pre-cast interior columns, and pre-cast plank between the parking level and the residential levels above. The Parking Level has 34 parking spaces, a mechanical and electrical room, an elevator and Lobby, and (2) Stairwells. Ground level includes Non-Profit Space, Lobby, Office, Mail/Parcel, Elevator, Unisex Bathroom, Mechanical Room, and Units. Levels 2 has the Community Room, Unisex Bathroom, Residential Units and Residential Storage Room. Levels 3, and 4 are Residential Units and Residential Storage Room. The building is wood framed with TPO membrane roof, Brick veneer, Fiber Cement Siding/Panels with vinyl windows. Site: .642-acre, portion of a City Blocks. Located at 601 and 615 Wisconsin Avenue in Appleton, WI. Razing of Existing Building, Site Demolition, Utility Tie-In to the Existing, Asphalt Parking Lot, Dumpster Enclosure, Site Concrete, and Landscaping & Retaining Wall. The construction schedule is figured for Early Spring 2025 Start. With a 12-month construction duration. The multifamily section of the project is required to meet all WHEDA requirements including Appendix M and Universal Design. Wisconsin Green Built Home selections are required to met. All MEP contractors will need to adhere to these requirements. For the business tenant space, coordination will be required with tenant architect drawings.
Post-Bid
Multi-Residential
$50,000,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2025
April 1, 2025
603 E Wisconsin Ave, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Feb 13 2025
Appleton, WI
Bid Date: Feb 18 2025
Appleton, WI
Bid Date: Mar 04 2025
Appleton, WI
Bid Date: Oct 27 2020
Appleton, WI
Bid Date: Feb 17 2025
Appleton, WI
Bid Date: Feb 18 2025
Appleton, WI
Bid Date: Feb 28 2025
Appleton, WI
Bid Date: Feb 28 2025
Appleton, WI
Bid Date: Feb 03 2025
Appleton, WI
Bid Date: Feb 13 2025
Appleton, WI
Bid Date: Feb 03 2025
Appleton, WI
Bid Date: Feb 03 2025
Appleton, WI
Bid Date: Feb 04 2025
Appleton, WI
--
Appleton, WI
Bid Date: Jan 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
