Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 19, 2025 at 7:00 PM
Updated February 20, 2025
Remodeling of an educational facility in Appleton, Wisconsin. Completed plans call for the remodel of a educational facility.
Fox Valley Technical College is soliciting quotes to add a wall in E122 to separate an area for a multipurpose room. The project will include general trades, electrical and data, HVAC and painting. This work will be awarded to (1) general contractor. DESCRIPTION OF WORK A. The project consists of modifications and additions to the existing HVAC ductwork systems. HVAC work includes but is not limitedto: 1. Removal of existing fiberglass duct board and replaced with new sheet metal ductwork insulated with either acoustic duct liner or external duct wrap as directed by the Owner. 2. Provide temporary support for any existing electrical conduit and/or boxes that are currently supported off existing ductwork. Provide permanent support for existing electrical conduit and boxes by other means after completion of the new ductwork installation. Electrical conduit and devices shall not be supported off mechanical ductwork and/or piping. 3. The Owner will provide existing HVAC drawings with the extent of the existing fiberglass ductwork highlighted for bidding purposes. The HVAC Contractor is required to visit the site to verify the existing duct routings should they differfrom the original plans to prepare an accurate bid. Failure to visit the site and verify existing conditions will void a bid. B. It is assumed that the contractor has experience in construction of this type of facility and will use that experience to develop a bid that includes those items required by code and those items typically found in this type offacility. C. Work Included: 1. The work covered by this Division of the specifications includes the furnishing of all necessary components and incidental items for executing and completing the HVAC work and work on related systems this includes: a. Labor b. Materials c. Tools d. Permits e. Temporary protection 2. Read all other Divisions of the Specifications which are applicable to this work, including the General Information section applicable to all bidders. 3. The HVAC Contract Requirements section is a supplement to and not a replacement for the project General Information section. 4. Failure to become acquainted with existing conditions at the site shall in noway relieve the responsibility for making installation in conformance with plans and specifications without additional cost to the owner. 5. Contractor is responsible for all cutting and patching associated withthe mechanical installation. Question Deadline: 02/13/2025 at 4:00 PM CT purchasing@fvtc.edu
Award
Educational
$19,480.00
Public - State/Provincial
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2025
May 19, 2025
1825 N Bluemound Dr, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Feb 28 2025
Appleton, WI
Bid Date: Feb 28 2025
Appleton, WI
Bid Date: Feb 24 2025
Appleton, WI
Bid Date: Mar 11 2025
Appleton, WI
Bid Date: Feb 25 2025
Appleton, WI
Bid Date: Feb 25 2025
Appleton, WI
Bid Date: Feb 25 2025
Appleton, WI
Bid Date: Mar 07 2025
Appleton, WI
Bid Date: Feb 17 2025
Appleton, WI
Bid Date: Oct 27 2020
Appleton, WI
Bid Date: Mar 04 2025
Appleton, WI
Bid Date: Feb 18 2025
Appleton, WI
Bid Date: Feb 13 2025
Appleton, WI
Bid Date: Feb 17 2025
Appleton, WI
Bid Date: Feb 03 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
