EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 13, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Columbus, Ohio. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of 2/13/2025 This project was postponed due to a lack of federal funding, which was impacted by an executive order. The project's status is indefinitely postponed until funding is restored. Lockman Lane Highwall for Furnishing the Materials and Performing the Labor for the Execution and Construction of: Project Name: Lockman Lane Highwall The Construction Completion Date for This Project is 8/30/2025 4:00:00 Am. The Estimate for This Project as Determined by the Division of Mineral Resources Management is $153,119.00.\ Each Proposal Must Be Accompanied by a Bid Guaranty, Meeting the Requirements of Section 153.54 of the Ohio Revised Code. Contractors Are Advised That Equal Employment Opportunity Conditions Are Applicable to This Proposal in Accordance With the Provisions of Sections 153.59 and 125.111 of the Ohio Revised Code. This Project is Subject to a 5% Edge Participation Goal in Accordance With the Provisions of O.r.c. Section 123.152 and O.a.c. 123:2-16-08. Davis Bacon Wage Rates Are Applicable to This Contract, the Contractor Agrees to Comply With All Provisions of the Davis Bacon Act as Amended (40 Us.s.c 3141-3148). No Bidder May Withdraw Their Bid Within Sixty (60) Days After the Actual Date of the Opening Thereof . Contact Melissa Price at 614-265-6369 With Any Questions Regarding Bidding. The Director of Natural Resources Reserves the Right to Reject Any or All Bids, or to Accept the Bid Which Embraces Such Combination Alternate Proposals as May Promote the Best Interest of the State.

Final Planning

Roads / Highways

$153,119.00

Public - State/Provincial

Paving, Site Work

9

12

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
64
Bidding Soon
1,174
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 28, 2025

img_map_placeholder

To Be Determined, Columbus, OH


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lockman Lane Highwall

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.