BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 10, 2025

Site work and new construction of a pre-engineered storage facility in Dubois, Idaho. Completed plans call for the construction of a 4,240-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Clark County EMS Project Description. New prefabricated metal building located in Dubois, ID, on the corner Main & Clark Streets. The 4,240 sq. ft structure will consist of an apparatus bay for EMS vehicles, meeting room, restroom/showers, offices and storage spaces. The foundation system is conventional spread footings. The building is sited on city lots 18-15. Davis Bacon Wages are required. Owner Requires the Project to Be Completed in Two Hundred Seventy (270) Calendar Days From The Date of Notice to Proceed.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$2,145,000.00

Public - County

New Construction, Site Work

51

26

6

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
13
Bidding Soon
134
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2025

August 8, 2025

Project location map

Main & Clark Street, Dubois, ID

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.