BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated September 19, 2025

Renovation of a municipal facility in Laurel, Maryland. Completed plans call for the renovation of a municipal facility.

Question Deadline 01/27/2025 at 2:00 PM ET All questions, including concerns regarding any applicable MBE or VSBE participation goals, shall identify in the subject line the Solicitation Number and Title for this IFB and must be submitted in writing via e-mail or to the Procurement Officer Stephen Rush srush2@mdot.maryland.gov 410-531-5533 WORK SCOPE A. General: 1. B. The existing roofing membrane, tapered roof system, flashings, and drainage provisions located above the rear conference room has failed. In order to properly restore the roof covering system to a watertight condition the SHA is considering bids for the replacement of the tapered roofing system, and roof drainage provisions; (metal comping flashing shall be salvaged and reused). Contractor shall be responsible for all administration, labor, material, and equipment required to complete the work of this Statement of Work. Work Items: 1. Submit all project information to the System Manufacturer for review and approval. a. 2. Provide proof of the System Manufacture's review and approval by providing to the SHA review comments, proposed changes to the work and determination of Warranty issuance. Completely remove, and legally dispose of, of a 24'X 24' the tapered roof assembly including plywood roof deck down to stringers. 3. 4. 5. 6. 7. 8. Substrate Preparation in accordance with the System Manufacturer's requirements. Install new 1/2 " plywood roof deck. Install new tapered roof system including gypsum cap sheet to achieve proper slope to the roof drain system. Install a new, heat welded single ply (TPO 060 or approved equal) PVC Roofing System: a. System shall include membrane, associated membrane flashings, and sealants b. c. (Metal comping caps shall be reused). Reinstall existing perimeter metal edge Coping per NRCA / SMACNA and System manufacturer specifications. Provide a five (5) year Roof System Warranty from the manufacturer covering all materials as well as the installation of those materials. The Contractor shall provide a two (2) year Workmanship Warranty for all installations.

Post-Bid

Municipal

$100,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
499
Active Projects
214
Bidding Soon
3,064
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

March 20, 2025

Project location map

I-95, Laurel, MD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.