Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 22, 2025 at 7:00 PM
Updated January 23, 2025
This is a service / maintenance or supply contract in Lemont, Illinois. Contact the soliciting agency for additional information.
Argonne National Laboratory is seeking to source: 2 Each S300 FAPBRANDED1 S300 Find # D01,D05, and D36 with attaching hardware to install per cell. 3 Each S304 FAPBRANDED1(1) S304 Tie Rod Replacement for Tower Model NC8407, Find D27. Includes Tie Rods, Cable Ties, and attaching hardware to install Per Cell. 2 Each ME Components FAPBRANDED1(2) ME COMPONENTS MIA 22&2400GR 364T-365T, Hardware kits 2 Each Motor Hold-Down Hardware Kit B95449 Motor Hold-Down Hardware Kit for motor frame sizes 324T thru 365T used on NC100 thru NC8300 and AV towers. Kit includes stainless S300 bolts, washers, nuts, shim set and Loctite sealer, per cell. S300 spirol pins for the Geareducer are also included. 2 Each Series 22.1T, 22.2, 22.3, 2200 C24687 Series 22.1T, 22.2, 22.3, 2200, 2250 and 2400, hardware and shims for securing gear box to mounting base. This kit also works for the series 20, 20T, 20.1, 20.2, 1800 and 2000. 3 Each IMI 685A Mechanical vibration 2558910 IMI 685A Mechanical vibration switch, DPDT, manual reset, 30 foot cord set, factory calibration (CSA/UL CE) 3 Each flex element kit E48593 Flex element kit for MC09 coupling. Includes flex element (tire), clamp rings, and SS hardware.Flex element kit for MC09 coupling. Includes flex element (tire), clamp rings, and SS hardware. 1 Each Seal spacer O ring 210302 Seal, spacer and O-ring kit for cell 3 oil seal change 1 Each Labor labor associated with installation of parts quoted 4 Each crane lift Crane rental fee 1 Each Angle modification labor Additional labor to install 3x3 angle material on towers for reinforcement. 3 Each 3x3x72 Angle FAPBRANDED2 3x3x72 SS 8GA stiffeners for D01. Includes all attaching hardware Please see attached solicitation package: 1. Please remember to sign page 1, as well as complete points A-B in red. 2. Please remember to fill out your BEST AND FINAL pricing on the individual line item boxes on page 2 with firm fixed-pricing in US Dollars. Please be sure BOTH these components are completed. NO SOLICITATION WILL BE CONSIDERED WITHOUT THESE COMPLETED. If any components are missing, your solicitation will be discarded. All forms and signed solicitation have a requested completion date of 1/28/2025 at 11:30PM CST. If there are any questions please feel free to reach out to awegrzyn@anl.gov.
Sub-Bidding
Laboratories
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
February 28, 2025
9700 S Cass Ave, Lemont, IL
Related To This Project
Lemont, IL
Bid Date: Jan 31 2025
Lemont, IL
Bid Date: Mar 12 2025
Lemont, IL
Bid Date: Apr 09 2025
Lemont, IL
Bid Date: Mar 05 2025
Lemont, IL
Bid Date: Mar 19 2025
Lemont, IL
Bid Date: Apr 10 2025
Lemont, IL
Bid Date: Apr 09 2025
Lemont, IL
Bid Date: Apr 16 2025
Lemont, IL
Bid Date: Jan 13 2025
Lemont, IL
Bid Date: Jan 30 2025
Lemont, IL
--
Lemont, IL
Bid Date: Dec 06 2024
Lemont, IL
Bid Date: Nov 12 2024
Lemont, IL
Bid Date: Nov 05 2024
Lemont, IL
Bid Date: Oct 31 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
