BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Demolition, site work, asbestos abatement and new construction of a mixed-use development in South Hamilton, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a 127,300-square-foot, three-story above grade educational facility; for site work for a educational facility; for asbestos abatement for a educational facility; playground / park / athletic field; and playground / park / athletic field.

Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. CM-at-Risk services for construction of a new three-story, 127,300 GSF elementary school, 740 students, grades 1-5. To be built on active school campus, construction of new school, followed by abate/demo existing school and site work - parking areas, playing fields. Project is located at 237 Asbury St., Hamilton, MA 01982. CMR Written Questions Due: 3:00PM Monday, March 24, 2025 All questions and requests for clarification or interpretation of the meaning of the RFP, and any other correspondence concerning the RFP, shall be submitted by email to: Kevin Nigro, Owner's Project Manager PMA Consultants, LLC 35 Braintree Hill Office Park, Suite 300 Braintree, MA 02184 Email address: knigro@pmaconsultants.com

Post-Bid

Educational

$109,661,828.00

Public - City

Asbestos Abatement, Demolition, LEED Certification, New Construction, Site Work

71

5

3

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
670
Active Projects
352
Bidding Soon
3,454
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

August 4, 2025

Project location map

237 Asbury St, South Hamilton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.