Published March 11, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Morgantown, West Virginia. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Project includes the following Work: The Project generally consists of the construction of a new pedestrian and bicyclist bridge that crosses Cobun Creek near the reservoir in White Park connecting the Mississippi Street side trails to the new South Side Trails. The proposed pedestrian bridge is a two span (85.5'/85.5') simply supported glued laminated (glulam) girder structure with glulam floor beams and timber stringers supporting a composite deck. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 5%. All questions about the meaning or intent of the Bidding Documents are to be sent in writing to Herbert, Rowland & Grubic, Inc. in accordance with the Instructions to Bidders. Telephone inquiries are unacceptable. Construction time limit is 150 calendar days for substantial completion and 30 calendar days immediately thereafter for final acceptance. Liquidated damages for Substantial Completion time is $1,000.00 per day and $1,000.00 per day for final acceptance. Statutory Requirements. Bidders must comply with all State antibid-rigging regulations pertaining to Work associated with this Project, and will be required to submit an executed non-collusion affidavit with the bid. All bids shall be irrevocable for 60 days after the bid opening date. All bidders must hold a current West Virginia contractors license or be eligible to acquire one on the date of the Bid Opening. The City of Morgantown reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the City of Morgantown, and to reject any or all proposals. Question Deadline 02/05/2025 All questions about the meaning or intent of the Bidding Documents are to be sent in writing to Herbert, Rowland & Grubic, Inc

Award

Bridges / Tunnels

$1,440,000.00

Public - City

New Construction, Paving, Site Work

80

14

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Spare Parts
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors, Tunneling and Mining, Shaft Construction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
75
Bidding Soon
683
All Active Projects
329
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

March 14, 2025

img_map_placeholder

To Be Determined, Morgantown, WV


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cobun Creek Bridge Construction Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.