Site work, paving and renovation of a civil project in Marshall, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and for the renovation of a water / sewer project.

Site Directions: Contact Village Office Description of Work: The Project consists of two (2) contracts and an alternate. Contract #1 - WWTF Construction includes: demolition of existing structure, Proposed Control and Headworks Building, mechanical screen, aeration blowers, generator, septic tanks, lagoon improvements, electrical, controls, process piping, aeration piping, and seepage cell improvements. Contract #2 - Sanitary Sewer Construction includes: sanitary force main, water main, and street patching on Tamarack Street, Mill Street, and Lagoon Lane. Alternate 'A' - Lift Station Construction includes: demolition of existing lift station, proposed duplex lift station, electrical, controls, portable generator, and sanitary sewer. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. A pre-bid conference will not be conducted, and bidders will not need to be prequalified. Additional Conditions: The letting of the work described herein is subject to the provisions of Sections 61.54, 62.15, 66.0901, and 66.0903(1m) of the Wisconsin Statutes. Contract #1 - WWTF Construction is funded in part by a Community Development Block Grant for Public Facilities (CDBG-PF) from the Wisconsin Department of Administration using federal CDBG funds. Conformance with the Build America, Buy America (BABA) Act requirements is required. Contract #1 - WWTF Construction, Contract #2 - Sanitary Sewer Construction, and Alternate 'A' - Lift Station Construction are funded in part with funds from the Wisconsin Department of Natural Resources Clean Water Fund Program (CWFP). Conformance with the American Iron & Steel (A.I.S.) requirements is required. The Village encourages Minority-owned Business Enterprises (MBE's), Women's Business Enterprises (WBE's), Disadvantaged Business Enterprises (DBE's), and Small Businesses in Rural Areas (SBRA's) to submit bids. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of participation for MBE/WBE utilization in accordance with s.NR 162.09(3), Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. Bidding Documents are available to Prospective Bidders NOW. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. and 4:30 p.m. CST. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Consideration of Bids: No proposal will be accepted unless accompanied by a certified check, bank money order, or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check, bank money order, or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Ms. Jamie Marcue, 875 S. Chestnut Street, Platteville, Wisconsin 53818. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except that additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER. Work of each separate Contract is identified in the following and on Drawings: 1. Contract #1 - WWTF Construction: a. Location: 1) Village of Lone Rock's Wastewater Treatment Facility. b. Description of Work to be completed: Wastewater Treatment Facility Improvements. Work includes: 1) Implementation of traffic control 2) Installation and maintenance of erosion control 3) Clearing and grubbing 4) Wastewater Bypassing 5) Process Piping a) Effluent return piping b) Aeration piping c) Force main piping d) Gravity piping 6) Valves 7) Pipe supports and anchors. 8) Tracer wire and tracer wire access boxes 9) Manholes 10) Installation of Proposed Headworks & Control Building a) Building excavation b) Concrete foundations c) Concrete flatwork d) Framing and sheathing e) Insulation f) Metal Roof g) Gutters and downspouts h) Interior and exterior lighting i) Interior signage j) Heating, Ventilation, and Air Conditioning (HVAC) k) Plumbing and fixtures. l) Doors and frames. m) Painting. n) Project Plaque. o) All interior and exterior finishes. p) Natural gas plumbing. q) Concrete pad for HVAC equipment r) Concrete pad for electrical transformer s) Concrete pad for generator t) The necessary machinery, equipment, tools, materials, labor, and all construction means and methods to complete the Proposed Headworks & Control Building in place and ready for use 11) Screening equipment 12) Blower equipment 13) Electrical and Controls a) Electrical b) Motor Control Center (MCC) c) Mechanical Screen Control Panel d) Telemetry e) SCADA system modifications 14) 60 kW natural gas generator a) Automatic Transfer Switch 15) 10,000 gallon Septic Tanks - 2 each 16) 20,000 gallon Septic Tanks - 2 each 17) Effluent return pump 18) Lagoon Desludging a) Sludge Management and Lagoon Desludging Plan has been completed by the Owner. b) Contractor to follow land application requirements of the Owner's sludge management plan c) Lagoons to be desludged in stages in order to maintain treatment of wastewater. d) Contractor shall not damage the lagoon liner. e) Contractor to provide all equipment and personnel to complete desludging. 19) If land application sites are used, Contractor to follow land application requirements of the Owner's sludge management plan 20) Lagoon Baffle Walls - 2 each a) Floats b) Baffle w/ 3'x3' opening c) Ballast d) Anchor System 21) Seepage cell modifications a) Installation of distribution piping b) Installation of plug valves c) Regrading seepage cell sand media 22) Primary Lagoon Aeration System a) 4" HDPE Drop Leg - 3 each (1) Anchor system b) 1.5" HDPE Manifold/Header - 9 each (1) Coarse bubble diffusers (2) Ballast 23) Secondary Lagoon Aeration System a) 4" HDPE Drop Leg - 3 each (1) Anchor system b) 1.5" HDPE Manifold/Header - 9 each (1) Coarse bubble diffusers (2) Ballast 24) Aeration Blowers - 2 each 25) Demolition, Removal, and Abandonment a) Demolition of building b) Removal of fence c) Removal of structures d) Removal and abandonment of process piping 26) Gravel Driveway 27) Concrete sidewalk/driveway (6") 28) Remove and reinstall chain-link site fence 29) Landscaping and restoration 2. Contract #2 - Sanitary Sewer Construction: a. Location: 1) Village of Lone Rock Wisconsin along Tamarack Street, North Mill Street, and Lagoon Lane. b. Description of Work to be completed: Force Main Construction. Work includes: 1) Implementation of traffic control 2) Installation and maintenance of erosion control 3) Clearing and grubbing 4) Wastewater Bypassing 5) Replacement of Sanitary Force Main from Lift Station #1 to the Wastewater Treatment Facility a) Installation of sanitary force main b) Installation of jack and bore railroad crossing c) Connections to existing d) Post construction testing 6) Installation of water main and associated appurtenances 7) Installation of tracer wire and tracer wire access boxes 8) Concrete Sidewalk (4") 9) Concrete Driveway (6") 10) Hot Mix Asphalt Pavement Patching (3") 11) Remove and reinstall chain-link site fence 12) Landscaping and restoration Question Deadline 02/10/2025 A. Written inquiries shall be mailed or hand delivered to Jordan Fure, P.E., Delta 3 Engineering, Inc., 875 S. Chestnut Street, Platteville, Wisconsin, 53818. (edit accordingly) B. Electronic inquiries shall be emailed to the following email address: furej@delta3eng.biz with the subject line iProposed 2025 Wastewater Treatment Facility Improvements n Lone Rock Questions received less than three days prior to the date for opening of Bids may not be answered.

Bid Results

Water / Sewer

$2,489,700.00

Public - City

Paving, Renovation, Site Work

20

27

3

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
137
Bidding Soon
1,929
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

July 1, 2025

Project location map

Multiple Locations, Marshall, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.