BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2025 at 7:00 PM

Updated August 7, 2025

Renovation of a medical facility in Grantsville, Maryland. Completed plans call for the renovation of a 3,600-square-foot, two-story above grade medical facility.

5. Anticipated Award of Project: March 6th, 2025 6. Anticipated Contractor's Notice to Proceed: March 10th. 2025 7. Anticipated Construction Start: March 24th. 2025 8. Substantial Completion: September 26th. 2025 9. 100% Construction Completion On or Before: October 27th. 2025 Renovation of an existing 2-story office building with exam rooms and Lab. The majority of the work takes place on the 2nd floor, but there is a portion of work on the 1st floor too. The project includes site improvements of (1) new light pole and base, new light poles on existing bases, relocated HVAC units, new concrete sidewalk/ramp at rear main entrance, and installation of an elevator in an existing elevator shaft. Bids shall be submitted for the Following Prime Contract: GC General Construction. Mountain Laurel Medical Center is requesting bids to be made and will award the contract to the lowest responsible bidder(s) all as more thoroughly described in the Contract Documents. A certified check, bid bond or a combination of both totaling an amount equal to ten percent (10%) of the total amount of the Base Bid PLUS any Add Alternates and made payable to the Owner, must accompany each bid. The Owner reserves the right to reject any or all bids, and/or to waive any informality, infirmity, omission, defect, irregularity and/or disqualifying error in any bid. The Owner anticipates awarding Contracts within thirty (30) days of the bid opening. No bona fide bids shall be altered or withdrawn for a period of sixty (60) days after the bid opening. All bids shall be clearly marked with contractor's name and Prime Contract number and name. .Question Deadline 02/14/2025 Written questions will be accepted by CORE Architects, LLC. via email: jreid@corepgh_com. Items which require clarification will be addressed by Addendum prior to the Bid date. Respectfully, Brian Bailey, CEO; Mountain Laurel Medical Center (301) 533-3300 bbailey@mtnlaurel.org. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$1,000,000.00

Public - City

Renovation

58

24

17

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
93
Bidding Soon
1,289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 10, 2025

Project location map

104 Parkview Dr, Grantsville, MD

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.