Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 21, 2025 at 7:00 PM
Updated October 1, 2024
Site work for a mixed-use development in Langley, Oklahoma. Completed plans call for site work for a power facility.
This Project consists of, but not limited to, construction/installation of ten (10) Drilled Pier foundations to support the installation of Fire-Barriers installed between each of the GSU Transformers. Contractors shall install the following foundations in accordance with the drawings. Refer to the drawings for the count and details of each foundation. This contract will require the use of High Early Type III concrete for all foundation applications. The contractor is to submit the batch mix for GRDA approval, which should include the name and manufacturer for each admixture and for curing compound. The proposed Type III mix design shall include test data at three (3), seven (7), fourteen (14) and twenty-eight (28) days of cure from date of pour. Type I and II will require test data at seven (7), fourteen (14), twenty-one (21) and twenty-eight (28) days of cure from date of pour. A cylinder break will be required along with verification from the engineer or project manager before steel & equipment can be placed on the foundation. The concrete mix design strength shall be as listed in the Technical Specification section. Before the foundations are poured, the anchor bolt pattern for the related steel shall be verified by the contractor to ensure that the steel will mount on the foundation correctly. This contract consists of the construction/installation of ten (10) drilled piers inside the GRDA Pensacola Dam Substation, located at 420 OK-82, Langley Ok 74350. Question Deadline 02/05/2025 at 2:00 PM CT Questions regarding this RFP must be submitted in writing to electronically. No questions may be submitted orally or via email. GRDA reserves the right to award multiple contracts, or no contracts, pursuant to this RFP. GRDA anticipates that, if a Contract is awarded pursuant to this RFP, the award will be made on or before: 2/12/25. GRDA reserves the right to reject any or all Bids, to waive any and all informalities, to evaluate Bids, to award or not award contracts, and to disregard all nonconforming, nonresponsive, and/or conditional Bids.
Post-Bid
Power Plant
$200,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 12 - Furnishings
Division 26 - Electrical
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2025
February 17, 2025

420 OK-82,, Langley, OK
Related To This Project
Langley, OK
Bid Date: Feb 28 2025
Langley, OK
Bid Date: Dec 31 2024
Langley, OK
Bid Date: Apr 09 2024
Langley, OK
Bid Date: Feb 20 2024
Langley, OK
--
Langley, OK
Bid Date: Mar 03 2023
Tulsa, OK
--
Park Hill, OK
Bid Date: Mar 04 2025
Stillwater, OK
Bid Date: Feb 17 2025
Sapulpa, OK
Bid Date: Feb 10 2025
Tulsa, OK
--
Tecumseh, OK
Bid Date: Mar 20 2025
Tahlequah, OK
Bid Date: Feb 18 2025
Tahlequah, OK
Bid Date: Feb 25 2025
Sand Springs, OK
Bid Date: Feb 25 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.