Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 10, 2025 at 8:00 PM
Updated March 11, 2025
Site work and paving for a road / highway in Pilot Mound, Manitoba. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Section I - Vicinity of Cartwright (C17206) Application of Micro Surfacing on Provincial Trunk Highway 3 from Provincial Trunk Highway 5 to the South Junction of Provincial Trunk Highway 34, for a total construction distance of approximately 29.7 kms in the Municipality of Louise. Section II - Vicinity of Marquette (C17240) Application of Micro Surfacing on Provincial Road 248 from Provincial Trunk Highway 26 to Provincial Trunk Highway 6, for a total construction distance of approximately 26.9 kms in the Municipality of Woodlands. Section III - Vicinity of Stonewall (C17232) Application of Micro Surfacing on Provincial Road 236 from 1.6km North of Provincial Trunk Highway 6 to Provincial Trunk Highway 7, for a total construction distance of approximately 33.0 kms in the Municipality of Rockwood. Section IV - Vicinity of Carberry (C17233) Application of Micro Surfacing on Provincial Trunk Highway 1 from 19.9km West of Provincial Trunk Highway 5 to 10.0km East of Provincial Trunk Highway 5 (Westbound Lanes), for a total construction distance of approximately 29.9 kms in the Municipality of North Cypress-Langford. Section V – Vicinity of Fairford (C17237) Application of Micro Surfacing on Provincial Trunk Highway 6 from 14.4km South of Provincial Road 513 (Fairford Dam) to Provincial Road 513, for a total construction distance of approximately 14.4 kms in the Municipality of Grahamdale. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Liquidated Damages the Work Must Be Completed by No Later Than September 01, 2025. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Four Hundred ($400.00) Dollars Per Calendar Day Until the Work is Completed. In Addition to the Daily Liquidated Damages, a Lump Sum Liquidated Damage of One Hundred Thousand ($100,000.00) Dollars Will Be Charged to the Contractor if the Work is Not Completed by September 15, 2025. In Addition, the Lump Sum Liquidated Damages Will Be Charged to the Contractor on a Recurrent Annual Basis Until Substantial Completion. Seasonal Shutdown Date the Seasonal Shutdown Date for This Project is: September 15, 2025. Question Acceptance Deadline: 2025/02/04 12:00:00 PM CST Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Award
Roads / Highways
$9,285,183.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
