BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2025 at 8:00 PM

Updated September 2, 2025

Site work and paving for a civil project in Van Buren, Arkansas. Completed plans call for site work for a water / sewer project; bridge / tunnel; road / highway; and for paving for a road / highway.

The Successful Bidder Will Be Required to Complete This Contract Withing Four Hundred Thirty-five (435) Calendar Days.the Purpose of This Project is to Level With Achm Surface Course and Notch and Widen Approximately 0.131 Miles, With Approximately 0.248 of Full Depth New Location Roadway Realignment, for Highway 59 In Crawford County at Rena. This Project Consists of Clearing and Grubbing, Removal and Disposal Items, Earthwork With Slope Benching, Aggregate Base Course, Achm Binder and Surface Courses, Maintenance of Traffic, Concrete Ditch Paving, Minor Drainages, Erosion Control, Rumble Strips, Pavement Marking, and Misc. Items. Routes: 59 Sections: 5 County: Crawford Length: 0.379 Mile in Length. The Successful Bidder Will Be Required to Complete This Contract Withing Two Hundred Twenty (220) Calendar Days. The Percentage Goal for Disadvantaged Business Enterprise (Dbe) Participation in This Project is 6.0%. Question Deadline 08/06/2025 - Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In order to have a bid considered, contractors must furnish a proposal guaranty consisting of either a bidder's bond or a certified or cashier's check in the amount of five percent (5%) of the total amount bid. In order for a bond to be acceptable to the Department, the company issuing the bond must be named in the Department of Treasury Listing of companies holding Certificates of Authority as acceptable sureties on Federal Bonds and as acceptable reinsuring companies. The Underwriting Limitation of the bonding company shall be adhered to. Any excess (between the face amount of the Bond and the Underwriting Limitation) shall be protected by reinsurance provided by an acceptable reinsuring company. These contracts are subject to normal prequalification, licensing and bonding requirements, applicable labor laws, non-discrimination provisions, wage rate laws and other Federal laws including the Fair Labor Standards Acts of 1938. The Work Hours Act of 1962 and Title VI of the Civil Rights Act of 1964 also apply. The Arkansas Department of Transportation (ARDOT) complies with all civil rights provisions of federal statutes and related authorities that prohibit discrimination in programs and activities receiving federal financial assistance. Therefore, ARDOT does not discriminate on the basis of race, sex, color, age, national origin, religion (not applicable as a protected group under the Federal Motor Carrier Safety Administration Title VI Program), disability, Limited English Proficiency (LEP), or low-income status in the admission, access to and treatment in ARDOT's programs and activities, as well as ARDOT's hiring or employment practices. Complaints of alleged discrimination and inquiries regarding ARDOT's nondiscrimination policies may be directed to Civil Rights Officer Joanna P. McFadden (ADA/504/Title VI Coordinator), P. 0. Box 2261, Little Rock, Arkansas 72203-2261, (501) 569-2298, (Voice/TTY 711), or the following email address: joanna.mcfadden@ardot.gov. The Department reserves the right to reject any or all bids and to waive any formalities. ARDOT - Hwy. 59 Realignment (Crawford Co.) (S)

Award

Roads / Highways

$3,574,041.00

Public - State/Provincial

Paving, Site Work

71

4

11

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
66
Bidding Soon
781
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

October 13, 2025

Project location map

S Hwy 59, Van Buren, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.