Site work and paving for a sidewalk / parking lot in Manhattan, Kansas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of April 14, 2025 the project was awarded to Cheney Construction Inc., but the awarded amount is not available.** The University seeks quotes from qualified bidders to replace sidewalks throughout the Manhattan campus. Refer to RFQ Exhibits A, B, and C for complete statements of the specifications and requirements. Project is anticipated to commence on or after May 19, 2025. Project to be ready to a point of final completion by July 31, 2025. Project to be awarded as a single contract for "Project as a Whole". Public works bonds required. A guide with directions on the preparation and submission of a proposal is available on the KSU Bid Portal homepage in the Resource Materials section and labeled as, "Submit a Bid or Proposal Guide." Question Deadline: Fri Feb 7, 2025 5:00:00 PM (CST) All questions related to this Request for Quotation, or the interpretation of drawings, specifications, etc., must be submitted through the Kansas State University Bid Portal before the date and time indicated in the Solicitation Schedule Appendix D - Co-operative Information identifies member Agencies of the NPPC that may opt to join this contract at any time upon expiry of their current contracts. This decision to join will be at each Agencys sole discretion. Bidders who are currently under contract to provide the services described herein, or who are currently performing work for the City or other NPPC agencies must also respond to this ITT to be considered for future work assignments. Repair approximately 13000 square foot of sidewalk across the University's Manhattan campus. All sidewalks will be 6" thick with 1/2" rebar dowels to existing concrete on 18" centers and 6" x 6" welded wire fabric on 2" chairs in the field of the pour. 2. 3500 PSI concrete 3. 40 locations per attached map and Exhibit B - Project Spreadsheet 4. Exhibit C - Square Footages provided per location are estimates only. It is left to the Bidder to calculate actual square footage measurements. 5. Contractor will be responsible for: a. Location of utilities b. Removal of concrete and trash c. Safety- fencing, cones, etc. 6. Tactile warning surfaces will be red to match other KSU warning surfaces 2 locations (40 and 41) a. https://adatile.com/surface-applied/ b. https://adatile.com/ada-radius-tactile-systems/

Award

Sidewalks / Parking Lot

$400,000.00

Public - State/Provincial

Paving, Site Work

3

3

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
24
Bidding Soon
415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2025

May 19, 2025

Project location map

Multiple Locations, Manhattan, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.