BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Renovation of a municipal facility in Hilo, Hawaii. Completed plans call for the renovation of a municipal facility.

**As of February 27,2025, This project has been awarded to Compu Dynamics, LLC, with the awarded amount of $183,532.56 .** l potential offerors are advised that the County of Hawaii reserves the right to reject any offer or proposal that does not follow these instructions. INSTALLATION For installation of UPS, At a minimum, the winning vendor shall: Project must be completed by 04/30/25. DELIVERY SITE SPECIFICATIONS H ni J Perform work requiring power outages over 2 weekends. Re-energize before Monday start of business. The Contractor will be responsible for offloading the equipment at the delivery site. Location is not equipped with a dock. No offloading equipment will be provided by the County. Contractor must furnish its own offloading equipment. 1 | Page 6. Remove existing APC 30 KVA UPS from site and dispose. 7. Clean work area daily. Scope of Work Phase 1 1. Remove 8 existing single pole breakers (which are off) and utilize 4 empty spaces in panel 2P to create space for four 3 pole 20A breakers. These breakers will feed 4 new N21-20 receptacles installed above the Galaxy UPS. 2. Install 125A input circuit wiring from panel 2EM to new wall mounted Maintenance Bypass Panel (MBP). Utilize existing 125A circuit breaker in panel 2EM. 3. Install existing UPS input/output wiring from MBP to existing panel 2P. 4. Re-energize existing UPS and panel 2P through MBP. 5. Test and label all circuit breakers and new outlets. 6. Perform work requiring power outages over weekend. Re-energize before Monday start of business. 7. Clean work area daily. Scope of Work Phase 2 1. Receive APC 25 KW Galaxy VS UPS, Maintenance Bypass Panel, and Lithium Ion battery cabinet at Hawaii County Office and move into IT Equipment Room. 2. Disconnect and remove existing 30 KVA 208V APC VT UPS from IT Equipment Room. 3. Install LDP-furnished APC 25 KW Galaxy VS UPS and Lithium Ion battery cabinet. Install LDP-furnished seismic bracing floor brackets. 4. Install UPS input/output wiring from MBP to APC 25 KW Galaxy VS UPS. 5. Perform work requiring power outage over weekend. Re-energize before Monday start of business. Any request for approval to substitute any item or take exception to any specification, special provision or general condition, or clarification must be received through the Public Purchase System on or before February 4, 2025

Award

Municipal

$183,533.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
4
Bidding Soon
81
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

Project location map

Multiple Locations, Hilo, HI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.