BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 12, 2025

Site work and paving for a road / highway in Hawkinsville, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Resurfacing of portions of N. Lumpkin Street and Industrial Blvd. The City of Hawkinsville reserves the right to accept or reject any or all bids and to waive technicalities. All potential bidders must be pre-qualified by GDOT All bids must be accompanied by a Bid Bond in the amount not less than ten percent (10%) of the Total Base Bid. Performance and Payment Bond, each in the amount of one hundred percent (100%) of the total contract amount, will be required of the successful bidder at execution of contract. Bonds must be written by an acceptable Surety Company licensed to do business in the State of Georgia and listed in the Department of Treasury, Circular 570, latest edition Question Deadline 02/25/2025 All questions about the meaning or intent of the Bidding Documents are to be directed to Owner. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Owner as having received the Bidding Documents. The number of days within which, or the dates by which, the Work is to be completed and ready for final payment on or by 120 days after Notice To Proceed and is set forth in the Proposal and the Agreement. Liquidated Damages: As time is an essential element in this contract, all work shall be completed within the allotted time as specified in item nine (9) above. For each calendar day that any portion of the road construction shall remain uncompleted after the end of the time specified, the amount of One Hundred Ten Dollars per calendar day ($110.00/day) will be assessed. The amount is assessed not as a penalty, but as a predetermined and agreed liquidated damages to be used, in part, to pay any additional expenses incurred by the Owner as a result of being delayed.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
49
Bidding Soon
526
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 3, 2025

Project location map

Multiple Locations, Hawkinsville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.