BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Site work for a water / sewer project in Kenosha, Wisconsin. Completed plans call for site work for a water / sewer project.

The estimated cost is $3.2 million. The County of Kenosha Wisconsin (County), through its Purchasing Division (Purchasing), requests bids to establish a contract for the restoration of the Pike River Streambank at the Petrifying Springs Park, 5555 7th Street, Kenosha, WI 53144. The attached Standard Terms and Conditions shall govern this bid unless specifically modified in these bid documents. Conditions of bid that include the word "must" or "shall," describe a mandatory requirement. All specifications are defined as mandatory minimum requirements unless otherwise stated. If no bidder is able to comply with a given specification or condition of bid, Purchasing reserves the right to delete that specification or condition of bid. Failure to meet specification requirements may disqualify your bid. Vendors may not submit their own contract document as a substitute for these terms and conditions. Question Deadline 02/17/2025 at 5:00 PM CT -- Last date for questions Addendum Posted (estimated and if needed) - 2/25/2025 @ 5:00 PM Vendor Responsibility Due - 2/28/2025 @ 5:00 PM Award of Contract (estimated) - 3/11/2025 @ 5:00 PM Kenosha County is not responsible for the content of any bid package received through any 3rd party or bid service. It is the sole responsibility of the vendor to ensure the completeness of the documents received through any 3rd party source. If a vendor discovers any significant ambiguity, error, conflict, discrepancy, omission, or other deficiency in this RFB, they shall notify the contact person named below of such error and request a modification or clarification. Any communications or questions regarding the specifications, or special conditions of bid should be written and submitted to Purchasing as soon as possible, but no later than 2/17/2025. Purchasing will respond to questions if necessary by issuing an official addendum, posted on The State of Wisconsin's Vendor Portal. Bidders are responsible for checking the portal for any addenda before submitting a bid. Failure to acknowledge addenda may disqualify your bid. Any correspondence or questions submitted must include the bid number. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Bid Results

Water / Sewer

$2,905,426.00

Public - County

Site Work

52

13

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
7
Bidding Soon
2,654
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

March 12, 2025

Project location map

5555 7th St, Kenosha, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.