BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work for a water / sewer project in Rancho Murieta, California. Completed plans call for site work for a water / sewer project.

Alameda Lift Station Replacement. This project will include demolition of existing station components, grout placement, replacement of the submersible sewage pump, piping, valves, and check valves for this station. In addition, the Contractor will be responsible for intercepting and pumping incoming sewage around the worksite as required. Rancho Murieta Community Services District Background Rancho Murieta Community Services District (District) was formed in 1982 by State Government Code 61000 to provide essential services in Rancho Murieta. The District provides essential services to an area of 3,500 acres (covering roughly five and a half square miles) located in the beautiful, wooded hills of eastern Sacramento County. The approved master plan calls for residential development on 1,920 acres with single-family residences, townhouses, apartments, and mobile homes for a total of 5,189 units. Current estimates indicate Rancho Murieta has 2,700 households with a population of approximately 6,000 people. The community is a balanced blend of both custom and production homes, townhouses, mobile homes, and a thriving retail complex. In addition, an airport, office building, fire station, and equestrian center are located in the District. The District is an independent Special District which provides the following services: o Water supply collection, treatment, and distribution o Wastewater supply, collection, treatment, and reuse (reclamation) o Storm drainage collection, disposal, and flood control o Security o Solid Waste collection All work will be at prevailing wage March 20, 2025 Anticipated Award Date March 21, 2025 Anticipated Notice to Proceed. Any inquiries concerning this request for proposals should be addressed to Eric Houston, Director of Operations or Travis Bohannon, Chief Plant Operator. All proposals shall remain firm for ninety (90) days following the closing date for receipt of proposals. Each Bid must be submitted on the prescribed forms and accompanied by cash, a cashier's check, certified check or bid bond executed on the prescribed form payable to the District in an amount not less than 10 percent of the amount bid The successful bidder will be required to furnish a payment bond and faithful performance bond each in the full amount of the Contract price, and insurance with certificates and endorsements of insurance, as provided in the Contract Documents. The required bonds must be provided only by a surety insurer who is admitted to do business by and in good standing with the California Department of Insurance. Bidders are hereby notified that in accordance with Public Contract Code section 22300, securities may be substituted for any monies that the District may withhold pursuant to the terms of this Contract to ensure performance. The successful bidder must possess the following classification or type of contractor's license issued by the Contractors State License Board: Class A, California. The attention of bidders is directed to the requirements and conditions of employment to be observed and prevailing wage rates to be paid to all workers employed under the Contract in accordance with Labor Code sections 1770 and following. Copies of the prevailing rate of per diem wages are on file at the District's office, and will be made available to any interested party on request. In accordance with Labor Code section 1771.4(a)(1), this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The District reserves the right to award the contract to the firm who represents the proposal which in the judgment of the District best accomplishes the desired results and shall include but not be limited to a consideration of the professional service fee. The District reserves the right to retain all proposals submitted and to use any idea(s) in a proposal regardless of whether that proposing firm is selected. Submission of a proposal indicates acceptance by the firm of the conditions contained in this request for proposals, unless clearly and specifically noted in the proposal submitted, and confirmed in the contract between the District and the firm selected. The District reserves the right to reject any or all proposals, to waive any non-material irregularities or information in any proposal, and to accept, negotiate, or reject any items or combination of items. RFP Issue Date 30 January 2025

Award

Water / Sewer

$1,000,000.00

Public - City

Site Work

9

16

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
430
Active Projects
196
Bidding Soon
3,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 21, 2025

Project location map

6635 Camino Del Lago Dr, Rancho Murieta, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.