BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2025 at 8:00 PM

Updated August 12, 2025

Site work and paving for a bridge / tunnel in Mount Zion, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of February 28, 2025 project was awarded to Klein Excavating, awarded amount is $247,516.19. Purchaser: Frederick Murphy Department: REALTYCAPPLAN422 - Office of Realty and Capital Planning 25 Organization: DNR - Natural Resources Info Contact: Contact Frederick.Murphy@illinois.gov There is no pre-bid conference for this project. The Illinois Department of Natural Resources ("Agency" or "State") requests Bids from responsible vendors to meet its needs. A brief description is set forth below for Bidder's convenience, with detailed requirements in subsequent sections of this solicitation. If interested and able to meet these requirements, the State appreciates and welcomes a Bid. The resulting contract with the awarded Bidder shall have an initial term of upon last signature to June 30, 2025. In no event will the total term of the contract, including the initial term, any renewal terms, and any extensions exceed ten (10) years. 30 ILCS 500/20-60. The estimated value of this Contract will be over $50,000.00. Please read the entire solicitation package and submit a Bid for evaluation in accordance with the instructions. All forms and signature areas contained in the solicitation package should be completed in full and submitted along with the price proposal which will constitute the Bid. Bidders should keep the instructions and a copy of their bids for future reference. Bids that do not adhere to form and content of the Invitation for Bid requirements may not be considered. DESCRIPTION OF THE PROJECT The Spitler Woods Recreational Trail Bridge Replacement project consists of a base bid and two alternate bids. The Base Bid consists of tree removal, clearing, pedestrian timber bridge removal, constructing a 50-foot span pedestrian bridge with cast in place concrete abutments, riprap, seeding, traffic control and other associated work. Bid Alternate 1 consists of clearing, tree removal, pedestrian timber bridge removal, installation of precast concrete pipe culvert with end sections, riprap, seeding and associated work. Bid Alternate 2 consists of clearing, pipe culvert removal, installation of precast concrete pipe culverts with end sections, seeding and associated work.

Award

Bridges / Tunnels

$247,516.00

Public - State/Provincial

Paving, Site Work

37

13

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
50
Bidding Soon
920
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

April 21, 2025

Project location map

705 Spitler Park Dr, Mount Zion, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.