BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Site work and paving for a mixed-use development in Idaho Falls, Idaho. Working plans call for site work for a sidewalk / parking lot; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of March 6, 2025 No bids received on the project ,No definite date for rebid. This project shall consist of the Contractor furnishing all of the tools, labor, equipment, and materials necessary to remove 480 LF of curb & gutter, 100 SY of concrete, and 3 fire hydrants, and install 100 LF of 6" water main pipe, 50 LF of 8" water main pipe, 8 gate valves, 3 hydrants, 18 water services, 480 LF of curb and gutter, 100 SY of concrete sidewalk, 80 meter boxes, and 550 LF of type surface restoration (landscaping), and any additional items specifically defined in the Bid Documents. No bids received. The Owner will also consider whether the bidder is a responsible bidder. Before a contract will be awarded for work contemplated herein, the Owner will conduct such investigation as is necessary to determine the performance record and ability of the apparent low Bidder to perform the size and type of work specified under this Contract. Upon request, the bidder shall submit such information as deemed necessary by the Owner to evaluate the Bidder's qualifications. All bids must be signed and accompanied by evidence of authority to sign. Bids must be accompanied by Bid Security in the form of a bid bond, certified check, cashier's check or cash in the amount of 5% of the amount of the bid proposal. Said bid security shall be forfeited to the City of Idaho Falls as liquidated damages should the successful bidder fail to enter into a contract in accordance with their proposal as specified in the Instructions to Bidders. The City of Idaho Falls reserves the right to reject any or all proposals, waive any nonmaterial irregularities in the bids received, and to accept the proposal deemed most advantageous to the best interest of the City of Idaho Fall. Question Deadline 02/09/2025

Final Planning

Water / Sewer

$600,000.00

Public - City

Paving, Site Work

19

9

2

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
3
Bidding Soon
174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

September 24, 2025

Project location map

Skyline Dr, Idaho Falls, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.