BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Site work and new construction of a fire / police facility in Port Washington, Wisconsin. Completed plans call for the construction of a 63,000-square-foot fire / police facility; and for site work for a fire / police facility.

New construction for the City of Port Washington Public Safety building. The project consists of office space, apparatus and vehicle bays, living quarters, training facilities, fitness facilities, and other functional spaces related to public safety. Project includes approximately 63,000 square feet of new construction, site improvements, and an alternate for training tower. The project will have multiple bid packages as noted below Construction is to commence in Spring of 2025 and be completed by Summer of 2026 as outlined in the project schedule. C.D. Smith is the Construction Manager at Risk and Bray Architect's the Designer. BP#1 - Core & Shell, BP#2 - Studs and Drywall, BP#3 - Roofing, BP#4 - Metal Panels, BP#5 - Glass & Glazing, BP#6- Carpentry, BP#7 - Earthwork, BP#8- Asphalt Paving, BP#9 - Landscaping, BP#10 - Site Utilities BP#11 - Fire Protection BP#12 - Plumbing BP#13 - HVAC BP#14- Electrical, Communications, ES&SBP#1 - Core & Shell BP#2 - Studs and Drywall BP#3 - Roofing BP#4 - Metal Panels BP#5 - Glass & Glazing BP#6- Carpentry BP#7 - Earthwork BP#8- Asphalt Paving BP#9 - Landscaping BP#10 - Site Utilities BP#11 - Fire Protection BP#12 - Plumbing BP#13 - HVAC BP#14- Electrical, Communications, ES&S Est. Completion Date: Jan. 29, 2026 The project includes a new building combining the City of Port Washington Police Department and Fire Department. The project consists of construction of a new 62,400 square foot building. The work consists of site work, earthwork, asphalt paving, landscaping, concrete, unit masonry, structural steel, steel joists & deck, finish carpentry, architectural woodwork, insulation, built-up asphalt roofing, metal roofing, flashings & sheet metal, hollow metal, wood doors, coiling doors, aluminum overhead doors, aluminum entrances, windows, hardware, glass & glazing, storefront drywall, tile, acoustical panel ceilings and grid, resilient work, carpet, painting, visual display boards, toilet partitions, flag poles, lockers, fire extinguishers & cabinets, toilet accessories, detention furniture, laminated plastic casework, hydraulic elevator, plumbing, hvac and electrical work. The last day for Pre-bid RFI’s and Substitution Requests will be February 20th, 2025 by 5:00pm.

Post-Bid

Fire / Police

$33,500,000.00

Public - City

New Construction, Site Work

234

35

144

4

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
2
Bidding Soon
1,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 14, 2025

Project location map

1540 W Grand Ave, Port Washington, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.