BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2025 at 8:00 PM

Updated March 25, 2025

Site work and paving for a mixed-use development in Park Forest, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Pavement replacement and resurfacing with storm sewer repairs including: PAVEMENT REM (34,506 SY), AGG SUBGRADE IMPR 12 (5,628 CY), REM & DISP UNS MATL (2,227 CY), HMA SC IL-9.5 D N50 (3,870 TON), HMA BC IL-19.0 N50 (4,837 TON), COMB CC&G TM4.12 (26,753 FT), DRAINAGE STRUCTURES (83 EA), STORM PIPE (692 FT), PC CONC SIDEWALK 5 (37,092 SF), DRIVEWAY PAVEMENT (2,772 SY), AND OTHER RELATED ITEMS OF WORK. All Bids must be accompanied by a Bidder's bond, certified check, bank cashier's check or bank draft payable to the Village of Park Forest for five percent (5%) of the total amount of the Bid as provided in the Bidder Instructions. The Board of Trustees reserves the right to reject any or all Bids and to waive technicalities. Unless the Bids are rejected for good cause, award of contract shall be made to the lowest responsible and responsive Bidder.

Bid Results

Roads / Highways

$4,885,334.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
274
Bidding Soon
3,373
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

Project location map

Multiple Locations, Park Forest, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.