BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work and paving for a mixed-use development in Park Forest, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Pavement replacement with storm sewer repairs including: PAVEMENT REM (36,320 SY), AGG SUBGRADE IMPR (8,296 CY), REM & DISP UNS MATL (2,688 CY), HMA SC IL-9.5 D N50 (4,703 TON), HMA BC IL-19.0 N50 (5,031 TON), COMB CC&G TM4.12 (27,003 FT), DRAINAGE STRUCTURES (102 EA), STORM PIPE (1,357 FT), PC CONC SIDEWALK 5 (46,919 SF), DRIVEWAY PAVEMENT (3,121 SY), AND OTHER RELATED ITEMS OF WORK. Engineer's Estimate is not available for this project.

Bid Results

Roads / Highways

$4,629,480.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
274
Bidding Soon
3,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

Project location map

Multiple Locations, Park Forest, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.