BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Renovation of a mixed-use development in Greenwich, Connecticut. Completed plans call for the renovation of a educational facility.

The contractor shall simultaneously with the signing of the Contract, furnish the Town the executed Performance, Maintenance, and Payment Bond of a surety company authorized to do business in the State of Connecticut, and acceptable to the Town, in the sum of the full amount of the Contract Obligation in the form provided by the Town. A PERFORMANCE BOND will not be required where the total estimated cost of labor and materials under the contract with respect to which such general bid is submitted is less than one-hundred thousand dollars ($100,000.00). Once a contract exceeds $100,000.00 the bidder will be responsible for obtaining and paying for all bonds required by Greenwich Public Schools. 2. Each bid shall be accompanied by a completed copy of the Bidders Qualification Questionnaire included in the bid documents. The Greenwich Public Schools reserve the right to request further information and/or supplemental information with respect to the Qualification Questionnaire at their sole discretion. Questions concerning this Bid will be received by e-mail only directed to the Bid Department at: (bid_department@greenwich.k12.ct.us). In the subject line you must put Project Description. All questions must be received no later than noon on February 18, 2025 at noon. Each Bid must be accompanied by Bid Bond prepared on the Form of Bid Bond attached hereto duly executed and acknowledged by the Bidder, as Principal, and by a surety satisfactory to Town as Surety. Bid Bond shall be in the sum of 10% of bid amount and shall be enclosed in the sealed envelope containing the Bid. Each such Bid Bond may be held by the Town as security for the fulfillment of the Bidder's agreements as hereinabove set forth and as set forth in the Bid. Should the Bidder fail to fulfill such agreements, the Bid Bond shall become payable to the Town as liquidated damages; otherwise, the Bid Bond shall become null and void. A BID BOND will not be required where the total estimated cost of labor and materials under the contract with respect to which such general bid is submitted is less than fifty thousand dollars ($50,000)

Award

Educational

$200,000.00

Public - City

Renovation

9

12

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
915
Active Projects
499
Bidding Soon
7,109
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

March 28, 2025

Project location map

Multiple Locations, Greenwich, CT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.