Site work and paving for a mixed-use development in Siren, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project includes the following Work: The project consists of reconstructing the Devil's Lake Boat Landing within the Village of Webster. The work includes construction of a new reinforced concrete boat ramp, dewatering, modification of an existing dock system, unclassified excavation, aggregate base course, asphalt paving, pavement markings, demolition of an existing pit toilet, installation of a new vault toilet, installation of a steel MC 18X42.7 cap on an existing steel sheet pile wall, and turf restoration of all disturbed areas. Specifically the work includes: 1 L.S. 10-Inch Thick Reinforced Cast-In-Place Boat Ramp 1 L.S. Pre-Fabricated Concrete Restroom, Complete 50 LF Furnish & Install Metal Sheet Pile Cap 1 L.S. Ramp Construction Dewatering 1 L.S. Lakebed Excavating - Dredging 600 S.Y Geotextile Fabrics 200 CY Crushed Aggregate Base Course 150 CY Breaker Run 50 TON Asphaltic Pavement 100 LF Asphaltic Curb 400 SF 4-Inch to 6-Inch Thick Concrete Sidewalk 90 LF Pavement Markings The work is anticipated to begin shortly after the Fourth of July weekend. The anticipated substantial completion is 45 calendar days after the date when the contract times commence and final completion is within 70 calendar days after the date when the contract times commence. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Burnett County Forest & Parks as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Burnett County Forest & Parks as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The project is funded in part by the Wisconsin Department of Natural Resources Recreational Boating Facilities Grants. OWNER reserves the right to waive any informalities or to reject any or all bids. Question Deadline 02/27/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Contact information and submittal procedures for such questions are as follows: A. MSA Professional Services, Phil Kriesel, Project Manager pkriesel@msa-ps.com

Award

Water / Sewer

$267,499.00

Public - County

Paving, Site Work

13

15

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
174
Bidding Soon
1,430
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

April 7, 2025

Project location map

To Be Determined, Siren, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.