BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

This is a service / maintenance or supply contract in Peoria, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 24, 2025, at 10:30 AM at the Region Three/District Four Office in Peoria. Phase III engineering services are required for Contract 68E44 in District 4. This contract is the rehabilitation of the Westbound McClugage Bridge spanning the Illinois River. Work includes the removal and the replacement of two bridge decks, structural steel repairs, painting of the Westbound McClugage Bridge, and all other collateral work needed to complete the project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The anticipated construction completion date is November 19, 2027 plus 40 working days. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the projec The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 36 - RFP - US 150 from IL 116 in East Peoria to IL 29 in Peoria (Westbound McClugage Bridge), Phase III Project

Conceptual

Bridges / Tunnels

$2,500,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
84
Bidding Soon
1,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

Project location map

Multiple Locations, Peoria, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.