Site work for a bridge / tunnel in Pocatello, Idaho. Completed plans call for site work for a bridge / tunnel.
The steam and condensate lines in the utility tunnel system on the ISU Campus in Pocatello need to be replaced along with the tunnels. The project phases will replace sections of the 60-year-old and heavily corroded steam and condensate lines, insulation, steam valves, and steam specialties. The 80+ year old tunnel structure is also in need of replacement due to deterioration of the concrete. This phase will replace about 350 feet of tunnel lid, floors, walls and access hatches. New Communication boring banks will be installed with about 635 feet with 5 conduits and 1,000 feet with 2 conduits. New Idaho Power boring banks with about 1,540 feet with 2 conduits and 465 feet with 1 conduit. Additionally, for Idaho Power there is about 860 feet of trenched work containing 1 and 2 conduits. The Communication work will require the installation of both fibber and copper lines along with terminations. The switchover at various buildings requires coordination with ISU and their providers. Short List for Interviews - March 13, 2025 Oral Interviews - Tentative March 25, 2025, -ISU Negotiate Contract - April 2025 Substantial Completion - December 2025 The anticipated project Overall Budget of $6,273,706 has been established for all construction, consulting fees, contingencies, testing, and other associated project costs. With the Overall Budget, the associated Construction Budget is $5,000,000 and the current Construction Estimate is $6,500,000. It is anticipated that additional funds will be added to the project to increase the Construction Budget to the Estimate. A complete construction cost estimate and construction schedule will be required following the CM/GCs review of the preliminary Construction Documents and must be updated throughout the Construction Document process. State reserves the right to reject any or all proposals received because of this request. Submit five (5) bound copies of the submittal, include one USB drive containing a PDF of the submittal. In your SOQ include the email address of the primary contact person, phone number, and office address. Failure to provide this information may result in the proposal being nonresponsive. The CM/GC will be required to provide payment and performance bonds in accordance with the Agreement Between Owner and Construction Manager dated February 2024.
Post-Bid
Bridges / Tunnels
$6,273,706.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2025
April 1, 2025
921 S 8th Ave, Pocatello, ID
Related To This Project
Pocatello, ID
Bid Date: Mar 04 2025
Pocatello, ID
Bid Date: Mar 04 2025
Pocatello, ID
Bid Date: Mar 06 2025
Pocatello, ID
Bid Date: Mar 14 2025
Pocatello, ID
Bid Date: Mar 07 2025
Pocatello, ID
Bid Date: Mar 05 2025
Pocatello, ID
--
Pocatello, ID
--
Pocatello, ID
--
Pocatello, ID
Bid Date: Feb 27 2025
Pocatello, ID
Bid Date: Feb 06 2025
Pocatello, ID
Bid Date: Feb 18 2025
Pocatello, ID
Bid Date: Feb 12 2025
Pocatello, ID
Bid Date: Feb 11 2025
Pocatello, ID
Bid Date: Jan 21 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.