Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 21, 2025 at 8:00 PM
Updated April 22, 2025
Site work and paving for a mixed-use development in Washington, District of Columbia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The scope of work includes, but is not limited to, the following major improvements: a. The removal and disposal of existing roadway pavement, curb, gutter, and sidewalks to the extents shown on plans or as necessary for access to trench excavation. b. The installation of PEPCO supplied materials such as PVC and fiberglass conduits, precast manholes, precast tapholes, precast transformer enclosures, and other related items and components. c. The furnishing and installation of pea gravel concrete for duct bank encasement. d. The furnishing and installation of thermal fill for duct bank encasement at transmission feeder crossings. e. The furnishing and installation of concrete and reinforcing steel for cast-in-place manhole construction. f. Excavation and backfilling of all utility cuts. g. Temporary restoration of all utility cuts. h. Permanent restoration of all utility cuts. i. Restoration of all pavement markings disturbed by the utility cut and pavement restoration work. Upgrade crosswalks to the high visibility type at all intersections within the project limits. j. Pavement profiling (milling) and overlay (approximately 2 inches) of utility cuts and per plan in accordance with DDOT standards. k. Installation of topsoil, seed, and mulch on all disturbed earth and grass areas. l. Installation of replacement curb (in-kind), curb and gutter (in-kind), and sidewalk (in-kind) sections. m) The installation and use of erosion and sediment control measures meeting DDOT/DOEE standards and per plan. n) Dust control during pavement saw cutting and excavation operations. o) Mobilization and demobilization, completion of field layout, provision and maintenance of engineer's field facilities, progress photographs, and rodent control. p) Maintain vehicular, bicycle and pedestrian traffic per DDOT Standard Specifications Section 612 and Attachment J.14 or as directed by the Contract Administrator. q) Maintain access to residential, institutional and commercial establishments using appropriate means as approved by the Contract Administrator. r) Maintain service of all existing utilities during construction. s) Work includes the disposal of all unsalvageable materials and all labor, materials, tools, equipment and incidentals necessary to obtain a complete and finished product. t) The Contractor shall be fully responsible for protection against damages for the duration of the Contract of all the utility structures within the Contract limits and adjacent thereto. The utilities include but are not limited to public and/or private water, sewer, electricity, gas and communications lines. No separate measurement or payment will be made. Cost of this protective work shall be reflected and distributed among the Contract pay items. u) Work also includes all incidentals needed to complete the project asshown on the Contract Drawings and within the Special Provisions Question Deadline 02/18/2025 at 5:00 PM ET Question Deadline Extended from 2/17/2025 Per Amendment 1 If a prospective bidder has any questions relative to the Solicitation, the prospective bidder shall submit the questions in writing to the Contracting Officer carol.hessler@dc.gov and copy Contract Specialist at Rickie.spivey@dc.gov The prospective bidder must also submit questions via District Department of Transportation (DDOT) DTAP Solicitation portal. Pursuant to the Contract award under this IFB, the Contractor shall provide all labor, materials, and equipment for the construction of the Project in accordance with the Contract Documents (the Work). Work under this Contract consists of the civil construction for PEPCO feeder 14093 of the DC Power Line Undergrounding (DC PLUG) Program, located in Ward 5 and bound by 12th St NE, Kearny St NE, 13th St NE, Rhoad Island Ave NE, Evarts St NE, 17th St NE, Channing St NE, Douglas St NE, 18th St NE, Queens Chaple Rd NE, 20th St NE, Franklin St NE, 22nd St NE, 24th St NE, 26th St NE, 27th St NE, and Vistas St as shown on the contract plans, indicated in the specifications / Special Provisions (J.8), as directed by the Contract Administrator.
Bid Results
Water / Sewer
$13,264,572.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2025
May 2, 2025
Multiple Locations, Washington, DC
Related To This Project
Washington, DC
--
Washington, DC
Bid Date: Apr 25 2025
Washington, DC
Bid Date: Feb 19 2025
Washington, DC
Bid Date: Feb 26 2025
Washington, DC
Bid Date: Jun 24 2025
Washington, DC
Bid Date: Mar 31 2025
Washington, DC
--
Washington, DC
Bid Date: Jun 13 2025
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Mar 03 2025
Washington, DC
Bid Date: Feb 24 2025
Washington, DC
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
