BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2025 at 8:00 PM

Updated March 25, 2025

Demolition and site work for a military facility in Richmond, Virginia. Completed plans call for the demolition of a military facility; and for site work for a military facility.

Questions and Answers: Can you confirm the list of government-furnished materials and the process for transportation to the site Print off the SOW before arrival, your POV will be the transportation Are there any specific restrictions or safety measures related to the handling of asbestos during demolition Follow the asbestos abatement plan. Could you provide additional clarification on the exact procedures for requesting work outside normal hours and the approval process You send a Request to the PM and He/She will request after hour time. What are the specific utility shutdown procedures and required notifications to the COR Notify PM (up to Day-of) and He or She will make it happen Could you clarify the steps for managing and reporting any changes in project scope during demolition Contact the PM. Could you provide more details on the DBIDS site visit access process Specifically, are there any additional steps or requirements for our team to complete before attending the February 26, 2025 site visit Yes submit QR Code no later then 1430 on 2/25/2025. Regarding the proposal/bid submission, could you clarify the submission process via DOD SAFE, particularly the deadline for requesting the "Drop Off" link and any other critical submission instructions -- The Contracting Officer (KO) will annotate contractor attendance at the site visit, as well as make an update to SAM asking for industry participants to reach out to KO with their email addresses so KO can open the DOD SAFE link for them to submit bid docs. There are limits on how early KO can do that with DOD SAFE, so the link will not be opened until after the site visit. Submission via DOD SAFE: Is the proposal required to be submitted through DOD SAFE, or is this platform strictly for bid submission -- DOD SAFE is for bid submission. Any docs that you would submit with your bid may go through there (ex/ bid price document as well as non-price proposal documents). That is the official place to submit your docs, because it timestamps the submissions with both the government's notice and your notice. Submission Requirements: If the proposal must be uploaded to DOD SAFE, please confirm any specific instructions, required documents, or additional steps necessary to comply. -- See question 7 Deadline Compliance: Is there a specific cut-off time for submission on March 12, 2025, or will proposals be accepted until 11:59 PM ET -- The due date is 11:59pm Eastern. You have the full day to submit bids through DOD SAFE. If there are any changes to this plan, I will notify everyone publicly via SAM, and likely offer an extension for fairness. Confirmation of Receipt: Once submitted, will we receive an official acknowledgment, and who should we contact if we encounter any technical issues -- Yes, DOD SAFE will sent confirmations to both you and I. Defense Supply Center Richmond (DSCR) Building 19 Partial Demolition Task Order: FA8903-22-F-0160 SP4703-25-B-0002, 7008842034 This is a solicitation for construction prepared in accordance with the format in FAR Part 14 and FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-25-B-0002 is issued as an Invitation for Bid (IFB). The resulting contract will be a firm-fixed price award with an expected Period of Performance of 365 days from the issuance of the Notice to Proceed. This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 238910 (Building Demolition). The small business size standard is $19M. DEPARTMENT OF LABOR WAGE DECISION (CONSTRUCTION) Any contract awarded as a result of this solicitation will be subject to the U.S. Department of Labor Wage Decision(s) Number VA20250017 01/10/2025. For an offer to be considered for award, the contractor must have a physical office from which mobilization occurs within 120 miles to DSCR. The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your bid. Site visit scheduled February 19, 2025 at 10:00am. Point of contact is Project Manager Bryan Broughton at bryan.broughton@dla.mil, 804-279-3999, 804-839-7911. Questions are due on February 27, 2025, end of day. Submit questions via email to Brandon.Jump@dla.mil. The estimated Magnitude of Construction for this project is between $1,000,000 and $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Military

$635,000.00

Public - Federal

Demolition, Site Work

47

31

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
113
Bidding Soon
1,407
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

March 31, 2025

Project location map

6090 Strathmore Rd, Richmond, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.