Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2025 at 7:00 PM
Updated March 6, 2025
Renovation of a municipal facility in St Pete Bch, Florida. Completed plans call for the renovation of a municipal facility.
The City of St. Pete Beach intends to contract the services of an experienced, qualified contractor to perform Concrete, Brick and Mortar Repair and Replacement. The undersigned, as Bidder, hereby declares that the only person or persons interested in the Bid as principal or principals are named herein, and that no person other than herein mentioned has any interest in the Bid or in the Agreement to be entered into; that this Bid or Agreement is made without connection with any other person, company, or parties making a Bid; and that it is in all respects fair and in good faith without collusion or fraud. The Bidder further declares that they have examined the site of the work and informed themselves fully in regard to all conditions pertaining to the place where the work is to be done; that they have examined the Plans and Specifications for the work and Contract Documents relative thereto, and have read all special provisions furnished prior to the opening of bids; and that they have satisfied themselves relative to the materials to be supplied and work to be performed. Each individual unit price for concrete work shall be all inclusive. This includes costs for mobilization, layout, saw cut and demolition and removal of existing sidewalk/ curb and any unsuitable sub-grade. Fill and compact new sub-grade where necessary. Unit price shall also include any and all disposal, disposal fees and trucking. Remove excess mortar with trowels and hand tools, and finish mortar joints with jointing tools to achieve a sealed, uniform appearance. Remove excess material from finished const ruction projects. Construct corners by fastening in plumb position a corner pole or building a corner pyramid of bricks, and filling in between the corners using a line from corner to corner to guide each course, or layer, of brick. Install masonry materials. Measure distance from reference points and mark guidelines to lay out work, using plumb bobs and levels. Measure materials or objects for installation or assembly. Mark reference points on construction materials. Break or cut bricks, tiles, or blocks to size, using trowel edge, hammer, or power saw. Cut tile, stone, or other masonry materials. Interpret blueprints and drawings to determine specifications and to calculate the materials required. Review blueprints or specifications to determine work requirements. Estimate materials requirements for projects. Fasten or fuse brick or other building material to structure with wire clamps, anchor holes, torch, or cement. Lay and align bricks, blocks, or tiles to build or repair structures. Calculate angles and courses and determine vertical and horizontal alignment of courses. Plan layout of construction, installation, or repairs. Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper. Examine brickwork or structure to determine need for repair. Inspect work sites to determine condition or necessary repairs. Spray or spread refractory material over brickwork to protect against deterioration. Apply sealants or other protective coatings. Apply mortar. Construction of new sidewalks must conform to all ADA standards. Any new sidewalks, aprons, or concrete paving, 6" thick, must contain reinforcing. Curbs are to be reconstructed to facilitate water drainage. Acceptable drainage is defined as all water drained from curb within 3 hours. Contractor is to patch back any disturbed asphalt, grass, or other area Question Deadline 02/26/2025 at 10:00 AM ET No oral interpretations will be made to any firms as to the meaning of the scope of work or any other contract documents included in this RFB. All questions pertaining to the terms and conditions or scope of work of this Request for Bid (RFB) must be sent in writing (e-mail is acceptable) to the City Procurement Manager All Contractors must contact the City's Procurement Manager, in writing via e-mail (jtaylor@stpetebeach.org), with their intention to bid, along with their company name and contact information at least five (5) business days before the bid package is due
Post-Bid
Municipal
$250,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2025
April 4, 2025
To Be Determined, St Pete Bch, FL
Related To This Project
St Pete Bch, FL
--
St Pete Bch, FL
Bid Date: Jul 09 2025
St Pete Bch, FL
Bid Date: Jun 04 2025
St Pete Bch, FL
Bid Date: Jul 16 2025
St Pete Bch, FL
--
St Pete Bch, FL
--
St Pete Bch, FL
Bid Date: Sep 17 2025
St Pete Bch, FL
--
St Pete Bch, FL
Bid Date: Mar 05 2025
St Pete Bch, FL
Bid Date: Jan 08 2025
St Pete Bch, FL
--
St Pete Bch, FL
Bid Date: Oct 30 2024
St Pete Bch, FL
Bid Date: Oct 09 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
