Published March 7, 2025 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in San Rafael, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project work is generally described as a. Installation of District-furnished sludge pump. b. Construction of equipment pad, pipe support, mount pump, and patch floor. c. Miscellaneous piping and electrical work. d. Demolition of existing pump and piping. e. Providing support for PLC testing, I/O verification, and miscellaneous system integration. f. Painting of new piping and pump and miscellaneous air ducting work. Installation of Owner-furnished sludge pump including associated piping and electrical work. Pursuant to UPCCAA procedures, interested bidders must be prequalified by the District prior to submitting an informal bid for projects under $220,000 such as this Project. Failure to do so will disqualify the bidder. Responses to this invitation from prequalified bidders must be received by District no later than the date and time and at the place shown above for consideration. Electronic copies are acceptable if followed by a phone call to the District at 415-472-1734 confirming receipt prior to the bid opening time. Email to: Michael P. Cortez at mcortez@lgvsd.org and cc: Irene Huang at ihuang@lgvsd.org and pquinn@lgvsd.org. Questions regarding the bid package should be directed in writing as soon as possible (but no later than five (5) working days prior to the opening of bids to: Michael P. Cortez, PE at mcortez@lgvsd.org and Irene Huang, PE at ihuang@lgvsd.org and pquinn@lgvsd.org or 415-472-1734. Where appropriate, the District may respond to such questions by addenda transmitted to all bid package recipients. The Project Contractor shall furnish all tools, equipment, apparatus, facilities, labor and material necessary to perform and complete in a good and workmanlike manner the construction of the SLUDGE PUMP REDUNDANCY PROJECT as shown in the Project Technical Specifications and Drawings and in accordance with the Contract Documents within 150 calendar days of the Project commencement date specified in the Notice to Proceed for the Project. All work should be performed and completed in a 30-day window within the contract duration of 150 calendar days. The Engineer's estimate is $75,000. 7. SCOPE OF WORK. The Project work is generally described as: a. Installation of District-furnished sludge pump. b. Construction of equipment pad, pipe support, mount pump, and patch floor. c. Miscellaneous piping and electrical work. d. Demolition of existing pump and piping. e. Providing support for PLC testing, I/O verification, and miscellaneous system integration. f. Painting of new piping and pump and miscellaneous air ducting work. 9. Pursuant to California Public Contract Code Section 3300, a Class A General Engineering California contractor's license is required to bid on the project. In accordance with California Business and Professions Code Section 7028.15, all project work must be performed by properly licensed contractors and subcontractors with active licenses in good standing as of the date and time specified for bid opening. Bids that do not satisfy applicable licensing requirements will be considered non-responsive. Licenses must be issued by the Contractor's State License Board of California and must be maintained in good standing throughout the project term. 10. In accordance with California Labor Code Section 1771, not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the project is to be performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in the California Labor Code shall be paid to all workers engaged in performing the project. In accordance with California Labor Code Section 1770 and following, the Director of Industrial Relations has determined the general prevailing wage per diem rates for work in the locality in which the project is to be performed. In accordance with California Labor Code Section 1773, the District has obtained the general prevailing rate of per diem wages and the general rate for holiday and overtime work in the locality in which the project is to be performed for each craft, classification or type of worker needed to perform the project. In accordance with California Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file at the District Engineer's Office and will be made available on request. All bids will remain valid for sixty (60) calendar days after the bid opening. Except as permitted by law and subject to all applicable remedies, including forfeiture of bidder's security, bidders may not withdraw their bid during the sixty (60) day period after the bid opening. The District reserves the right to reject any or all bids, to waive minor irregularities and/or formalities as determined by the District, to award the bid by item or groups of items or in total, and/or to award the bid in the manner most advantageous to the District. The District reserves the right to, at its discretion, purchase additional units, within a reasonable time, at the bid unit price, upon concurrence of the bidder.

Post-Bid

Water / Sewer

$75,000.00

Public - City

Renovation, Site Work

18

10

31

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Submittals, Maintenance Data, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Trenching
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
122
Bidding Soon
2,044
All Active Projects
888
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

March 31, 2025

img_map_placeholder

To Be Determined, San Rafael, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sludge Pump Redundancy Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.