BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2025 at 8:00 PM

Updated April 11, 2025

Site work and paving for a road / highway in Beloit, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 1st, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Labor, material, tools and equipment necessary for the following projects: PROJECT: TB-2025-01 2025 PAVING PROGRAM Pulverize and Reshape Pavement 20,715 SY3/4 Base Aggregate Dense 675 TON 1 1/4 Base Aggregate Dense (Undistributed) 895 TON HMA Pavement 3 LT 58-28 S 2,670 TON HMA Pavement 4 LT 58-28 S 2,075 TON HMA Pavement 2.5" Driveway 240 TON Full Depth Sawcut 2,375 LF Restoration 2,620 SY Actual work shall be commenced within ten (10) days after written Notice to Proceed has been issued. Bids shall be made on the forms of proposal attached to the Specifications and no bids shall be considered unless made on such forms. Complete digital project bidding documents are available at online. You may obtain the digital plan documents for $30.00 by online. This form shall be submitted to the Office of the Engineer no less than five (5) days prior to the bid opening. Failure to submit a qualification statement at least five (5) days prior to bid opening may result in the rejection of the bid. The questionnaire shall be kept on file and be valid for the calendar year, subject to the Contractor's status through the year. Additional blank forms of this questionnaire can be obtained from the Consulting Engineer's office. Prior filing of such form with the Town of Beloit or Consulting Engineer for the current calendar year shall satisfy this requirement. No bid can be received or considered unless accompanied by a Bid Bond or a Certified Check equal to ten percent (10%) of the bid, payable to the Town of Beloit, as a guarantee that, if the bid is accepted, the bidder will execute and file the proper Contract and 100% Performance Bond and Labor and Material Payment Bond within ten (10) days from the date the lowest responsible bidder's bid is accepted. In the event the bidder fails to file such Contract and Bond within the time set by the Town, the check or bond shall be forfeited to the Town as liquidated damages. The Town of Beloit reserves the right to reject any or all bids and to waive or not to waive any informalities in the bidding. The letting of the contract described herein is subject to provisions of Sections 66.0901 of the Wisconsin Statutes. After bids are opened, no bid can be withdrawn for a period of ninety (90) days thereafter.

Award

Roads / Highways

$532,874.00

Public - City

Paving, Site Work

5

4

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
607
Active Projects
234
Bidding Soon
3,654
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

March 24, 2025

Project location map

Multiple Locations, Beloit, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.