Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 12, 2025 at 8:00 PM
Updated October 1, 2024
Site work, new construction and remodeling of a municipal facility in Edina, Minnesota. Completed plans call for the construction of a municipal facility; for the remodel of a municipal facility; and for site work for a municipal facility.
Edina Public Works - Gender Neutral Restroom Project includes remodel of locker room and new restroom. The work shall consist of furnishing labor, equipment, and materials necessary to complete design and specifications provided for project by HGA, Inc. . Questions are due by March 7th at the end of business day A. Project includes remodel of an existing women's locker room to include a public-facing unisex restroom at 7450 Metro Blvd, Edina, MN 55439. The project scope includes approximately 500 sq. ft. of demolition and interior construction. New interior walls will be constructed with new HVAC, electrical and lighting in the women's locker room and unisex restroom. The work will be classified as an Alteration Level 2 upgrade per the IEBC. An Alteration Level 2 includes the reconfiguration of space, the addition or elimination of any door or window, the reconfiguration or extension of any system, or the installation of any additional equipment. The work area is not permitted to exceed 50% of the building. B. Work Included: Provide labor, materials, equipment, and services to fulfill the Contractor's obligations to complete Project within intent of Contract Documents. C. Construction Limits: Except as specifically indicated or as may be necessary to complete the Work under the Contract, activities of the Contract shall be limited to within the limits designated on Drawings. . Start Date: May 5th, 2025 . Completion Date: August 1st, 2025 Site photos were issued 3-4-2025.
GC Bidding
Municipal
$90,000.00
Public - City
New Construction, Remodeling, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 04 - Masonry
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2025
August 15, 2025
7450 Metro Blvd, Edina, MN
Related To This Project
Edina, MN
Bid Date: Feb 27 2025
Edina, MN
Bid Date: Mar 13 2025
Edina, MN
Bid Date: Mar 03 2025
Edina, MN
Bid Date: Mar 20 2025
Edina, MN
Bid Date: Mar 25 2025
Edina, MN
Bid Date: Mar 20 2025
Edina, MN
Bid Date: Mar 25 2025
Edina, MN
Bid Date: Mar 27 2025
Edina, MN
Bid Date: Feb 25 2025
Edina, MN
Bid Date: Feb 07 2025
Edina, MN
--
Edina, MN
Bid Date: Jan 14 2025
Edina, MN
Bid Date: Jan 17 2025
Edina, MN
Bid Date: Mar 28 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.