BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2025 at 7:00 PM

Updated March 9, 2025

Site work and paving for a mixed-use development in Farmington, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Question Deadline 02/27/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Dushane Parkway/Spruce Street Improvements Approximate quantities of major items of work are as follows: Remove Curb & Gutter - 2010 LF Common Excavation - 4,500 CY Aggregate Base Class 5 - 2,110 CY Bituminous Pavement - 1,300 TON Concrete Curb and Gutter - 2,600 LF RCP Storm Sewer (15"-21") - 1,050 LF 8" PVC Pipe Sewer - 505 LF 8" DIP Watermain - 100 LF 16" DIP Watermain - 550 LF Revise Lighting System - 1 LS Pavement Markings - 1,300 LF Bids must be on the basis of cash payment for the work and materials, and no bid will be considered unless accompanied by a bidder's bond, payable to the City. The bid bonds must be payable to the City of Farmington in the amount of five percent (5%) of the amount of the bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder fails to promptly enter into a written contract and furnish the required bonds. The City of Farmington reserves the right to reject any and all bids, to waive any informality therein, and to adjourn the meeting to a later date for the purpose of further consideration of the bids and taking action thereon. No bid may be withdrawn within 90 days after the date of opening of bids.

Bid Results

Roads / Highways

$883,868.00

Public - City

Paving, Site Work

60

7

8

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
147
Bidding Soon
1,572
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

May 30, 2025

Project location map

Spruce St & Dushane Pkwy, Farmington, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.