Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2025 at 8:00 PM
Updated March 28, 2025
Site work and paving for a bridge / tunnel in Alger, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge rehabilitation including replacement of wearing surface, waterproofing membrane and deck expansion joint, bridge railing repair, concrete surface coating of concrete bridge railing, concrete prestressed beam repairs, concrete patching of pier cap and approach work on Herner Road and Secord Dam Road over the Tittabawassee River and Secord Dam, Gladwin County. This is a Local Agency project. 4% Dbe Participation Required Net classification required for this project is 628 Fa or Comb/Jt. 628 Cb, N7 In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Fa and N7. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No BFP 26000 218085A 25A0255 Completion Date: 11/14/2025 MIDOT - 2503 018 - Bridge Rehabilitation Including Replacement of Wearing Surface, Waterproofing Membrane and Deck Expansion Joint, Bridge Railing Repair on Herner Road and Secord Dam Road
Award
Bridges / Tunnels
$825,595.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2025
April 7, 2025
Herner Rd & Secord Dam Rd, Alger, MI
Related To This Project
Alger, MI
Bid Date: Mar 28 2025
Alger, MI
Bid Date: Mar 28 2025
Alger, MI
Bid Date: Jul 21 2025
Alger, MI
Bid Date: Jun 11 2025
Alger, MI
Bid Date: Sep 16 2025
Alger, MI
Bid Date: Oct 17 2025
Alger, MI
Bid Date: Oct 17 2023
Alger, MI
Bid Date: Nov 17 2023
Alger, MI
Bid Date: Oct 17 2023
Grand Rapids, MI
Bid Date: Feb 25 2025
Coldwater, MI
Bid Date: Feb 24 2025
Cadillac, MI
Bid Date: Mar 11 2025
Port Huron, MI
Bid Date: Mar 04 2025
Adrian, MI
Bid Date: Feb 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
