BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2023 at 8:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Alger, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Site Directions: 6180 Bobcat Trail Alger, MI 48610 This project is for the stabilization of the area downstream of the Forest Lake Dam. The project includes site access road and laydown area construction, removal of the existing failed structure, storm sewer construction, open channel construction, installation of soil erosion control measures, site grading, and site restoration.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Paving, Site Work

12

12

28

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
15
Bidding Soon
423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

November 16, 2023

Project location map

6180 Bobcat Trl, Alger, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.