BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2025 at 7:00 PM

Updated July 2, 2025

Site work and paving for a mixed-use development in Alcoa, Tennessee. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

Reference Number 0000374748 Project No.: 088400.000 The Construction of Mcghee Tyson Airport (Tys) Runway 5r-23l Rehabilitation - Project 1. The scope of this project includes grading and drainage improvements in preparation for the Rehabilitation of Runway 5R-23L. General work elements for this project include: 1. Selective Demolition 2. Duct Banks, Conduits & Cabling 3. Grading and Drainage Construction 4. Temporary and Permanent Erosion & Sediment Control Measures 5. Other Miscellaneous Items Bid Intent Required Bid Intent Deadline 03/06/2025 02:00 PM EST Question Acceptance Deadline 02/27/2025 05:00 PM EST Questions are submitted online Yes General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Bid security in the form of a bid bond equal to 5% of the total bid is required. Contract security in the form of 100% Performance and Payment bonds will also be required. The Project shall be ready for Final Inspection within a maximum of 230 consecutive calendar days from the effective date of the Notice-to-Proceed. No bid may be withdrawn and all bids shall remain open after closing time for the receipt of proposals for a period of ninety (90) calendar days. A contract will be awarded to the lowest, responsive, and responsible bidder in the best interest of the Metropolitan Knoxville Airport Authority. Award of a contract is dependent upon concurrence with the Federal Aviation Administration. This project is subject to the requirements of the MKAA Disadvantaged Business Enterprise Program. The Owner has established a contract goal of 8.86% participation for small business concerns owned and controlled by qualified disadvantaged business enterprises (DBE). The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet the established goal. The Owner reserves the right to reject any bid submitted by a contractor which has claims or litigation pending against the Owner, or in which a contractor which has claims or litigation pending against the Owner is named as a potential subcontractor.

Post-Bid

Transportation Terminals

$4,000,000.00

Public - County

Paving, Site Work

106

18

197

7

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
73
Bidding Soon
810
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

May 5, 2025

Project location map

2055 Alcoa Hwy, Alcoa, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.