Site work for a water / sewer project in Edison, New Jersey. Working plans call for site work for a water / sewer project.

As of February 27, 2025 project was postponed. Leak Detection System Installation The purpose of this contract is to install a Smart Hydrant Leak Detection System throughout the municipal owned water system. Included in the Work is the selection and replacement of 25 service pipe connections, installation of 25 leak monitoring nodes and vault pits, as well as replacement of 900 4-inch nozzle caps, and trench and roadway restoration. Also included will the supply of Software and yearly monitoring fees and portable leak detecting equipment as outlined in the contract documents and all else necessary to complete the installation and operation of the leak detection system. All Work on this Contract shall be completed within 100 Calendar Days from issuance of the Notice to Proceed. Bid Packets must be accompanied by a Statement of Consent of Surety from a surety company holding a Certificate of Authorization to do business in the State of New Jersey and either a Bid Bond or a Certified Check drawn to the order of Township of Edison for not less than ten percent (10%) of the total bid price amount, except that the check shall not exceed $20,000.00. The successful Bidder is hereby notified that a Performance and Payment Bonds for the full amount of this Project isrequired. The award of the Contract for this Project will not be made until the necessary funds have been provided by Township of Edison in a lawful manner. Please be advised that this Project is being funded through Township of Edison. By virtue of Executive Order #34 (1976), vendors currently suspended, debarred or disqualified are excluded from participating on this Project. The successful Bidder shall be required to comply with the applicable statutory requirements of the Contract Documents and Plans which include all of the following: (i) N.J.A.C. 17:27; (ii) N.J.S.A. 10:5-31 et seq.; (iii) Business Registrations (N.J.S.A. 52:32- 44); (iv) Prevailing Wage Act (N.J.S.A. 34:11-56.25, et seq.); (v) Public Work Contractor Registration (N.J.S.A. 34:11-56.48); and (vi) Affirmative Action Requirements (N.J.S.A. 10:5-1, et seq.); and any other legal requirements applicable to this Project. Township of Edison intends to award this Project to the lowest Bidder whose Bid Packet is responsive and complies with its requirements for the Project, provided that in the judgment of Township of Edison is reasonable, within available funds and in the interest of Township of Edison. Township of Edison reserves the right to reject any and all Bid Packets to the extent permitted by law. An award will be made or Bid Packets will be rejected within sixty (60) Calendar Days after the opening of the Bid Packets, during which time the Bid Packets shall be irrevocable and unavailable to withdraw by Bidders, unless otherwise extended in the Contract Documents. Township of Edison further reserves the right to modify this Contract through the distribution of Addenda to plan holders of record without further publication. Bids will be evaluated on the basis of this Advertisement plus any Addenda issued by Township of Edison prior to the opening of the Proposal. This procurement will be subject to regulations contained in applicable sections of the New Jersey Local Public Contracts Law in effect on the date of the assistance award for this project. Under the terms of any contract awarded under this invitation for bids, the successful bidder shall fully comply with the requirements, terms, and conditions of the NJDEP's Socially and Economically Disadvantaged Individuals (SEDs) Regulations, NJAC 7:22- 3.17(a)24, 7:22-4.17(a), or 7:22-6.17(a)24, and 7:22-9.1 et seq. Bidders are required to comply with the requirements of P.L. 1975, c127. Contractor must award not less than 10% of the costs for construction, materials, or services to small business concerns owned and controlled by SEDs and must comply with the Project Plan developed by the Owner fulfilling SED utilization. All applicable surety bonds required in connection with the advertisement and award of building contracts or sub agreements must be written by a surety company listed on the Federal Treasury List (Department Circular 570 - Surety Companies Acceptable on Federal bonds), incorporated herein by reference. Copies of this document may be obtained from the Department. This contract or subcontract is expected to be funded in part with funds from the New Jersey Department of Environmental Protection and the New Jersey Environmental Infrastructure Trust. Neither the State of New Jersey, the New Jersey Environmental Infrastructure Trust nor any of their departments, agencies or employees is, or will be, a party to this contract or subcontract or any lower tier contract or subcontract. This contract or subcontract is subject to the provisions of N.J.A.C. 7:22-3, 4, 5, 9 and 10, Local Public Contract, Department of Labor Current Wage Rate Determination, Prevailing Wage Act, Contract Works Hours and Safety Standard Act, Copland Act, Davis Bacon Act, Buy American Clause, Debarment and Suspension, and Socially and Economically Disadvantaged according to N.J.A.C. 7:22-3.17(d), 4.17(d). Funds for this project are to be provided by the New Jersey Environmental Infrastructure Financing Program. Therefore, the successful bidder shall be required to comply with the provisions of the New Jersey prevailing Wage Act, Chapter 150 of the Laws of 1963, effective January 1, 1964 and the Public Works Contractor Registration Act (NJSA 34:11-56.48). Question Deadline 02/24/2025 at 4:00 PM ET All questions, regarding, clarifications, omissions, discrepancies or otherwise, shall be submitted in writing to the Township via email at puchasing@edisonnj.gov

Final Planning

Water / Sewer

$200,000.00

Public - City

Site Work

5

14

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Project Record Documents
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Equipment, Water Service Connections
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
564
Active Projects
322
Bidding Soon
5,103
All Active Projects
2,355
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

August 27, 2025

img_map_placeholder

Multiple Locations, Edison, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Smarthydrant Leak Detection System Installation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.