BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Demolition, site work and addition to an educational facility in Placentia, California. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code, and be licensed to perform the work called for in the Contract Documents. The successful bidder must possess a valid and active Class B License, at the time of award and throughout the duration of this Contract. The Contractor's California State License number shall be clearly stated on the bidder's proposal Subcontractors shall be licensed pursuant to California law for the trades necessary to perform the Work called for in the Contract Documents. Each bid must strictly conform with and be responsive to the Contract Documents as defined in the General Conditions. Each bid must strictly conform with and be responsive to the Contract Documents as defined in the General Conditions. Prevailing wages are applicable to the Project. These per diem rates, including holiday and overtime work, as well as employer payments for health and welfare, pension, vacation, and similar purposes, are available from the Director of the Department of Industrial Relations. Pursuant to California Labor Code Sections 1720 et seq., it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon any subcontractor under such Contractor, to pay not less than the said specified rates to all workers employed by them in the execution of the Contract. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in the Labor Code, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. The Contractor and all subcontractors shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least on a monthly basis (or more frequently if required by the District or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. Monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE). Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount issued by a California admitted surety as defined in California Code of Civil Procedure Section 995.120, are required, and shall be provided to the Owner prior to execution of the Contract and shall be in the form set forth in the Contract Documents. Where applicable (including projects receiving funding under the State School Facilities Program), bidders must meet the requirements set forth in Public Contract Code Section 10115 et seq., Military and Veterans Code Section 999 et seq. and California Code of Regulations, Title 2, Section 1896.60 et seq. regarding Disabled Veteran Business Enterprise ("DVBE") Programs. It is each bidder's sole responsibility to ensure its bid is timely delivered and received at the location designated as specified above. Any bid received at the designated location after the scheduled closing time for receipt of bids shall be returned to the bidder unopened. General: The work indicated on the Contract Documents - Prepared by Studio Plus Architectural firm consists of the building of new restrooms within existing kindergarten classrooms. Linda Vista Elementary School 5600 Ohio Street Yorba Linda, CA 92886 Sierra Vista Elementary School 1811 N Placentia Ave Placentia, CA 92870 Van Buren Elementary School 1245 N Van Buren St Placentia, CA 92870 B. Work Included: The work to be performed by the Contractor shall conform to all of the contract documents such as, but not be limited to, the requirements of Division 0, Division 1, General Conditions, Instructions to Bidders, Specifications and all Drawings, Addenda, and all sheets contained within the project documents and other related documents, and shall include the furnishing of all layout, supervision, labor, services, materials, installation, cartage, craning, hoisting, supplies, insurance, equipment, scaffolding, tools, and other facilities of every kind and description required for the prompt and efficient execution of the work described herein and to perform Work necessary or incidental to complete the Project in strict accordance with the Contract Documents, for: Linda Vista, Sierra Vista, Van Buren Elementary School Restroom Additions: Bid 225-08 C. General Scope of Construction Work shall be as specified above and also shall include, but not be limited to, the following: 1. Provide video and photos of site conditions before commencing work. 2. Coordinate the work with the Maintenance and Facilities Departments. 3. Patch, repair, seal, and paint all surfaces and substrates affected by the work of this contract to match adjacent surfaces to achieve uniformity. 4. Perform tests, provide certifications and related reports necessary for the execution of the project. 5. Perform demolition and disposal of all materials, surfaces and devices to be removed incidental to the execution and installation of the work in accordance with the contract documents. 6. Locate rebars with ground penetrating radar technology prior to the drilling or coring through concrete masonry unit (CMU) walls to avoid the cutting of reinforcing wall components. All costs associated with this service shall be borne by the contractor. Provide reports. 7. Execute the work as required to provide a complete and functional system installation in accordance with the manufacturer's specifications. 8. Extend existing electrical devices flush with new finished surfaces and provide access panels for concealed utility valves in the walls to be covered. 9. Selective demolition, including coring, of all material and devices to be removed for the successful installation of the Contractor's work and the replacement of the same. 10. Patching: New, unfinished surfaces created by the removal of existing materials and surfaces that were damaged or disturbed by remodeling work, shall be patched with new materials and finished to match existing work and fire rating as much as required to provide a uniform and even appearance. 12. Preserve and protect all existing work to remain. Repair all existing features affecting work to match adjoining parts or surfaces. All demolition work cut back to natural breaks where possible to facilitate continuity of surface planes and satisfactory bending of surfaces. 13. Clean the project site as required to keep the premises in an orderly and safe condition at all times. Provide daily clean-up to keep the campus free of dirt, dust and debris. 14. Provide final cleanup for all interior and exterior project areas and surfaces. 15. Layout of the scope of work to ensure proper location and accuracy, including field measurements required for coordination and ordering of materials. 16. Provide and maintain on-site, roll-off trash bins for the duration of the project. All costs for dumping, hauling and relocating on site are the responsibility of the Contractor. Maintain dumpsters so that trash is not stockpiled on the sites. District -owned dumpsters shall not be used. 17. Prime and paint exposed conduit and piping to match surfaces of attachment. 18. Perform the relocation, removal, reinstallation and reconnection of electrical conduit, light fixtures, low voltage conduit or raceway, fire alarm conduit or raceway and respective devices, mechanical ductwork and terminals, and plumbing piping and devices required for the execution and completion of the work under this contract. 19. Provide fire-safing at penetrations thru fire rated walls, floors and ceilings. 20. Provide temporary restroom facilities for the workers throughout the duration of the contract.

Award

Educational

$398,000.00

Public - County

Addition, Demolition, Site Work

129

7

2

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
621
Active Projects
278
Bidding Soon
3,494
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

June 16, 2025

Project location map

Multiple Locations, Placentia, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.