BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Site work for a water / sewer project in Highland, Utah. Working plans call for site work for a water / sewer project.

Questions Due Date: Feb 20th 2025, 5:00 PM MST All questions relative to the project shall be submitted online via Trever Aston at trever@highlandcity.org The location of the project are various locations throughout Highland City, Utah. C. The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following: The installation of approximately 22,331 linear feet of 8" and 10" cured-in-place pipe (CIPP). After liner has cured, Contractor will reconnect all lateral connections. Other work includes any by-pass pumping required for the pipe lining, traffic control and other items incidental to this type of construction. Bid security in the amount of 5 % (percent) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract. A. No Pre-Bid Conference will be held CONTRACT TIME A. The Work shall be substantially completed as indicated below Phase 1 Work - May 30, 2025 Phase 2 Work -Begin after July 1, 2025 with completion of 60 days after mobilization. Phase 3 Work - Begin after July 1, 2026 with completion of 60 days after mobilization. Phase 4 Work -Begin after July 1, 2027 with completion of 60 days after mobilization. B. The Work for each phase shall be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions 30 days after the abovementioned date of Substantial Completion. C. It is the intent of the City to award Phase 1 and 2 immediately and then award Phase 3 and 4 separately so that the projects may be completed together if so inclined. A. The OWNER reserves the right to reject any or all bids; or to accept or reject the whole or any part of any bid; or to waive any informality or technicality in any bid in the best interest of the OWNER. Only bids giving a firm quotation properly signed will be accepted. . Bids shall remain valid for 30 days after the day of Bid opening. Bidders who withdraw their bid after Bid opening, but before expiration of said period, shall forfeit their bid security if Notice of Intent to Award to the successful Bidder is made by OWNER.

Final Planning

Water / Sewer

$500,000.00

Public - City

Site Work

11

11

2

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
54
Bidding Soon
1,021
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

September 4, 2025

Project location map

Multiple Locations, Highland, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.