BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2025 at 8:00 PM

Updated March 19, 2025

Site work for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

The objective of this contract is to perform stump grinding, stump spoil removal and site restoration work typically between the curb and sidewalk in the right of way throughout the City of Milwaukee bounded by the following geographical areas. Located at: Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94 Project 4: Central Forestry District: Area approximately bounded by W Congress St. to W Center St. & N Sherman Blvd. to Lake Michigan Project 5: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits Time for Completion: All assigned work, up to the maximum contract dollar amount, shall be completed no later than November 7, 2025 beginning five (5) working days from the date of issuance of the Notice to Proceed. Anticipated start date (when the Notice to Proceed may be issued): approximately April 14, 2025. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office in-person or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, within 24 hours upon being notified that they are the apparent low bidder. Please contact the DPW Contracts Office at 414-286-3314 should you have any questions or concerns regarding the training or reporting process. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: $500. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. Liquidated Damages, per diem: see Section 15.0 in the scope of work for Stump Grinding, Removal and Site Restoration Specifications. The residency requirement for these projects is waived. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Project 1 LONESTAR LANDSCAPING, LLC $178,624.30 Project 2 RODRIGUEZ LANDSCAPE CO $208,900.00 Project 3 ROCKSTAR LANDSCAPING & PLOWING LLC $175,706.00 Project 4 ROCKSTAR LANDSCAPING & PLOWING LLC $186,408.00 Project 5 ROCKSTAR LANDSCAPING & PLOWING LLC $169,110.25 Project 6 ROCKSTAR LANDSCAPING & PLOWING LLC $169,585.25

Award

Roads / Highways

$1,088,333.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
184
Bidding Soon
1,942
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

April 14, 2025

Project location map

Multiple Locations, Milwaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.