BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2025 at 8:00 PM

Updated March 21, 2025

Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.

This project will consist of extending the existing cruise shore power system on Pier 91 at Terminal 91 and Pier 66 at Bell Harbor Cruise Terminal to provide maximum flexibility of the system to accommodate the greatest number of known and potential cruise ships shore power configurations. At a minimum, all home ported cruise ships must be able to connect to shore power by 2027. The anticipated contract execution date is 3rd Quarter 2025. Substantial completion is expected 2nd Quarter 2027. The WMBE goal is 6%. This project has a Project Labor Agreement. The Port of Seattle invites the submittal of Statement of Qualifications (SOQs) from firms, or teams of firms, interested in providing Progressive Design Build services for the T-91/P66 Cruise Shore Power Extensions Project at Terminal 91 and Pier 66. This project will consist of extending cruise shore power system on pier 91 at terminal 91 and pier 66 at bell harbor cruise terminal to provide maximum flexibility of the system to accommodate the greatest number of known and potential cruise ships shore power configurations. At a minimum all home ported cruise ships must be able to connect to shore power by 2027. This is a PLA agreement project. The Ports estimated progressive design build is 10M to 15M excluding sales tax. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Port of Seattle is not responsible for any costs incurred in response to this solicitation. The Port of Seattle is an equal Opportunity Employer and encourages Women and Minority Business Enterprises (WMBE) to participate in the competitive process. In support of the WMBE Community, the Port of Seattle has established a WMBE utilization requirement. The WMBE utilization goal is 6% for this contract. Communication with the port regarding this solicitation shall be directed to the Central procurement office, Beth Sisk at 206-450-3978 or Sisk.B@portseattle.org.

Post-Bid

Water / Sewer

$15,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
93
Bidding Soon
1,384
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

July 21, 2025

Project location map

2225 Alaskan Wy, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.