BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2025 at 7:00 PM

Updated March 9, 2025

Site work and paving for a civil project in Seattle, Washington. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The project consists of the installation of approximately 3,000 linear feet of 8-inch ductile iron water main for the replacement of the existing 6-inch cast iron water main on 92nd Street West, 61st Avenue West, 62nd Place West, and 63rd Place West as shown on the Plans and as described in the Specifications. The project also includes installation of new water services, hydrants, valves, blowoff assembly, connections to existing water system, hot mix asphalt trench patch, and general restoration. The project also provides for roadway improvements consisting of a full width 2-inch grind and hot mix asphalt overlay and pavement markings. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "Mukilteo Water and Wastewater District" and in an amount of not less than five percent (5%) of the total Proposal amount. The Mukilteo Water and Wastewater District expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. The work specified in this Section covers the demolition of existing structures, piping, equipment, and sitework, and the salvage of existing materials and equipment as indicated on the Plans and as specified herein. The Plans show the major items to be demolished and removed. In addition to these items, the Contractor shall remove any other incidental above-grade items which are not to be used in the completed project.

Post-Bid

Water / Sewer

$1,636,000.00

Public - City

Paving, Site Work

41

14

6

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
100
Bidding Soon
1,773
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 28, 2025

Project location map

Multiple Locations, Seattle, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.