BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2025 at 8:00 PM

Updated March 25, 2025

Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Scope three parts to the overall project; Mason Road ADA Ramp, Hutchinson Hall Front Entry and Stevens Way Curb Ramps. The scope includes but is not limited to selective site demolition, pavement removal, regrading, asphalt and concrete paving, striping, ADA ramps, drainage upgrades, site lighting, landscaping and irrigation improvements. Questions: Questions about this project should be directed to: Joss Gramstad, Consultant, KPFF Consulting Engineers, Joss.Gramstad@kpff.com, 206.622.5822 (O) / 206.926.0642 (D) SDCI #7042135-CN

Bid Results

Sidewalks / Parking Lot

$1,771,546.00

Public - State/Provincial

Paving, Site Work

83

23

13

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
115
Bidding Soon
1,772
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

July 10, 2025

Project location map

Multiple Locations, Seattle, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.