BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; road / highway; and road / highway.

As of April 22nd, 2025 this portion of the project has not been awarded yet. ***Please contact Skanska directly for access to plans and specifications.*** Skanska is soliciting all interested subcontractors and suppliers, as well as certified Small, Veteran, Minority & Woman owned companies for the bid package listed below. RFP 032 Temporary Concrete Barrier This project has 5% SBE, 3% VOB, 10% MBE and 6% WBE participation goals. Skanska intends to conduct itself in good faith with all interested subcontractors as well as certified SBE/VOB/MBE/WBE firms looking for subcontract opportunities on this project. If you are a SBE/VOB/MBE/WBE firm, please provide your certification with your proposal. All interested subcontractors, please indicate all lower tier SBE/VOB/MBE/WBE participation offered on your proposal as it will be evaluated with your price. Skanska will assist qualified subcontractors, vendors, & suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. To permit maximum participation, when feasible Skanska will review breaking out scope packages and adjusting schedules to help permit maximum participation of SBE/VOB/MBE/WBE on the project. Subcontractor may be requested to furnish a bond, if required Skanska will pay bond premium up to 1%. Please call if we can assist you in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. Skanska is an EEO/AA/Vet/Disability Employer. On behalf of the Skanska team, thank you for your interest in our project. Skanska has been awarded the SR 520, I-5 to Montlake - I/C and Bridge Replacement project in Seattle, Washington. This project will replace the existing Portage Bay Bridge, with two new parallel variable depth segmental box girder bridges across Portage Bay, the existing SR 520 eastbound off-ramp structure to Montlake Boulevard East, the existing 10th Ave E and Delmar E under-crossings with a new Roanoke Lid Bridge, and provide approximately 75 retaining walls. This project will also extend the SR 520's transit/HOV system from Montlake to I-5 and the cross-lake bicycle and pedestrian trail over Portage Bay to a new lid between Delmar Drive East and 10th Avenue East. If you have questions, please contact the project inclusivity manager, Suzanne Arkle 720-324-8580 suzanne@zanninc.com

Post-Bid

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
115
Bidding Soon
1,782
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 28, 2025

Project location map

WA-520, Seattle, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.