BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2025 at 7:00 PM

Updated February 13, 2025

Site work and paving for a mixed-use development in Bellevue, Washington. Working plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.

The project will provide for a new arterial roadway connection between 130th Avenue NE and 132nd Avenue NE. The project will be developed in a coordinated approach with Sound Transit who will be implementing the East Link Light Rail Transit(LRT) project including a station to be located between the eastbound and westbound lanes in this new segment of NE Spring Blvd. and an associated park and ride facility to the north of NE Spring Blvd. The project will include intersection designs at 130th and 132nd Avenues that will integrate traffic, pedestrian, and bicycle movements with the LRT crossings. The roadway cross-section outside of the LRT alignment will include a single travel lane in each direction, buffered bike lanes, curb, gutter, sidewalk, illumination, landscaping, irrigation, storm drainage, water quality treatment, and other underground utilities. Construction may be in two stages: Stage 1 north of the East Link tracks and Stage 2 south of tracks. County: King Agency: Auburn Length : 0.120 Begin Termini : 130th Avenue NE End Termini :132nd Avenue NE As of February 12, 2025, the project is in Final Planning status. Anticipated letting year is 2025. WADOT - NE Spring Boulevard - 130th Ave to 132nd Ave NE *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$21,786,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
145
Bidding Soon
1,426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.