Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 14, 2025 at 8:00 PM
Updated March 15, 2025
Site work for a water / sewer project in Bellevue, Washington. Completed plans call for site work for a water / sewer project.
Work contemplated to be performed under this contract is as follows: o Replacement of approximately 1,900 linear feet of asbestos cement water main with new ductile iron water main including: removal of asbestos cement water main; remove existing hydrants; install new hydrants; install new valves; install new fittings; install new services; hardscape restoration; landscape restoration; and miscellaneous modifications. BID BOND REQUIRED: Each bid shall be accompanied by a bid bond in the form of cash, certified check, cashier's check or surety bond in an amount equal to at least 5% of the amount of such bid. Checks shall be made payable to the City Treasurer. Should the successful bidder fail to enter into a contract and furnish a satisfactory performance and payment bond within the time stated in the specifications, the bid bond shall be forfeited to the City of Bellevue. Addenda may not be available or updated on any other website other than through the official plan holders list. SUPPLEMENTAL RESPONSIBLE BIDDER CRITERIA Supplemental Responsible Bidder Criteria will apply to this project, and are included in the Special Contract Information section, Item 17. In a timely manner, Bidders may request, in writing, that the City modify the supplemental criteria. The City reserves the right to modify or not modify the supplemental criteria in its discretion. The City shall issue an Addendum, prior to the Bid Due Date, should it modify the supplemental criteria. The City shall not modify the supplemental criteria after the Bid Due Date, therefore, Bidders are encouraged to discuss with the project manager immediately and before the Bid Due Date the relevancy of the supplemental bidder criteria. Any bidder determined to be not responsible based on these supplemental criteria may appeal the City's determination by providing additional information to the City within two 2 business days following receipt of the City's written determination that the bidder was determined not responsible. The City of Bellevue reserves the right to reject any and all bids and to waive irregularities and informalities in the bidding process. No bidder may withdraw their bid for a period of ninety (90) days after the date and time set for the opening thereof. The successful bidder must comply with the City of Bellevue equal opportunity requirements. The City of Bellevue is committed to a program of equal employment opportunity regardless of race, color, creed, religion, gender, age, national origin, pregnancy, genetic information, marital status, sexual orientation (including gender identity), or the presence of any sensory, physical, or mental disability. The City of Bellevue's is also committed to complying with Title VI of the Civil Rights Act of 1964, that provides "No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance."
Bid Results
Water / Sewer
$1,172,064.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
April 14, 2025
To Be Determined, Bellevue, WA
Related To This Project
Bellevue, WA
--
Bellevue, WA
Bid Date: Mar 17 2025
Bellevue, WA
Bid Date: Mar 20 2025
Bellevue, WA
Bid Date: Apr 10 2025
Bellevue, WA
Bid Date: Mar 20 2025
Bellevue, WA
Bid Date: Apr 08 2025
Bellevue, WA
--
Bellevue, WA
Bid Date: Apr 22 2025
Bellevue, WA
Bid Date: Feb 25 2025
Bellevue, WA
Bid Date: Feb 21 2025
Bellevue, WA
--
Bellevue, WA
--
Bellevue, WA
Bid Date: Aug 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
